The Ministry of Industry and Trade of Vietnam issued Circular No. 10/2017/TT-BCT providing 18 procedures for technical inspection of occupational safety of machinery, equipment and supplies subject to strict occupational safety requirements.
According to Circular No. 10/2017/TT-BCT of the Ministry of Industry and Trade of Vietnam, form and duration of inspection of occupational safety of pressure vessels are as follows:
Initial inspection: After installation, before first use.
Periodic inspection:
- Internal and external inspection, hydraulic test (technical inspection): every 6 years.
- Internal and external search: every 3 years; for containers containing corrosive and explosive substances: every 2 years.
- In case the manufacturer specifies or the establishment requires a shorter time of safety technical inspection, follow the manufacturer's regulations or the requirements of the establishment.
- When shortening the inspection period, the inspector must clearly state the reason in the inspection record.
- When the inspection period is specified in the national technical regulations, the provisions of that regulation shall be followed.
Irregular inspection
- After repairing, upgrading or renovating, it affects the safe technical condition of the pressure vessel.
- After changing the installation position.
- The vessel stops working for 12 months or more.
- At the request of the establishment or the competent authority.
View more details at Circular No. 10/2017/TT-BCT of the Ministry of Industry and Trade of Vietnam, effective from September 15, 2017.
- Thanh Lam -
Address: | 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City |
Phone: | (028) 7302 2286 |
E-mail: | info@lawnet.vn |