4 Conditions to be Ensured When Inspecting Boilers with Pressure Over 16 BAR

The Ministry of Industry and Trade promulgates Circular 10/2017/TT-BCT on the technical safety inspection procedures for machinery, equipment, and materials with strict safety requirements.

According to the inspection procedures issued in Circular 10, the following conditions must be met when conducting boiler inspections:

- The boiler must be in a state ready for inspection.- The boiler's documentation and records must be complete.- Environmental and weather factors should not affect the inspection results.- Safety, occupational hygiene, and fire prevention conditions must be met for boiler inspection.

The boiler inspection will be carried out in 06 steps as follows:

- Preparation work before conducting the inspection.- Checking boiler documentation and history.- External and internal technical inspection.- Hydraulic testing.- Operational inspection.- Processing inspection results.

Note: The following inspection steps should only proceed if the preceding step's results meet the required standards.

See more inspection forms in Circular 10/2017/TT-BCT, effective from September 15, 2017.

- Thanh Lam -

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

0 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;