No.

Description

Amount (VND)

A

Assessment for issuance of license by central-government authority

 

I

Specialized electricity consultancy

10,400,000

II

Generation

 

1

Hydroelectric plants

 

1.1

Installed capacity of not exceeding 10 MW

10,600,000

1.2

Installed capacity of at least 10 MW but not exceeding 30 MW

15,000,000

1.3

Installed capacity of at least 30 MW but not exceeding 100 MW

18,000,000

1.4

Installed capacity of at least 100 MW but not exceeding 300 MW

24,500,000

1.5

Installed capacity of at least 300 MW

28,800,000

2

Thermo-electric plants

 

2.1

Installed capacity of not exceeding 50 MW

17,800,000

2.2

Installed capacity of at least 50 MW but not exceeding 100 MW

21,900,000

2.3

Installed capacity of at least 100 MW

28,800,000

III

Transmission

24,900,000

IV

Distribution

 

1

Total length of transmission lines of not exceeding 1,000 km or total capacity of electrical substation of not exceeding 300 MVA

12,100,000

2

Total length of transmission lines of at least 1,000 km but not exceeding 2,000 km or total capacity of electrical substation of at least 300 MVA but not exceeding 600 MVA

13,700,000

3

Total length of transmission lines of at least 2,000 km but not exceeding 3,000 km or total capacity of electrical substation of at least 600 MVA but not exceeding 1,000 MVA

18,800,000

4

Total length of transmission lines of at least 3,000 km or total capacity of electrical substation of at least 1,000 MVA

21,800,000

V

Export and import

 

1

Capacity of not exceeding 10 MW

9,700,000

2

Capacity of at least 10 MW but not exceeding 100 MW

12,100,000

3

Capacity of at least 100 MW but not exceeding 300 MW

16,200,000

4

Capacity of at least 300 MW

19,200,000

VI

Wholesale

19,200,000

VII

Retail sale

 

1

Commercial power consumption of not exceeding 10 GWh per month

9,700,000

2

Commercial power consumption of at least 10 GWh but not exceeding 50 GWh per month

12,500,000

3

Commercial power consumption of at least 50 GWh per month

16,700,000

B

Assessment for issuance of license by People’s Committee of province

 

1

Specialized electricity consultancy

800,000

2

Generation

2,100,000

3

Distribution

800,000

4

Retail sale

700,000

View more details at Circular No. 167/2016/TT-BTC of the Ministry of Finance of Vietnam, effective from January 01, 2017.

- Thanh Lam -

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

18 lượt xem



Related Document
  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;