Project on Road Bridges: At What Length Is an Environmental Impact Assessment Report Required?

How long does a road bridge construction project need to be before it is required to prepare an environmental impact assessment report? Please provide the regulations.

Clause 1, Article 18 of the Law on Environmental Protection 2014 stipulates that entities required to conduct environmental impact assessment include:

- Projects under the decision-making authority on investment policy of the National Assembly, the Government of Vietnam, and the Prime Minister of the Government of Vietnam;

- Projects that use land within nature reserves, national parks, historical and cultural sites, world heritage sites, biosphere reserves, and recognized scenic spots;

- Projects with the potential to negatively impact the environment.

According to Appendix II of the List of projects requiring an environmental impact assessment report issued together with Decree 40/2019/ND-CP, investment projects for the construction of road bridges and railway bridges with a length of 500 meters or more (excluding the approach roads) must prepare an environmental impact assessment report.

Therefore, road bridge construction projects with a length of 500 meters or more (excluding the approach roads) must prepare an environmental impact assessment report.

Sincerely!

Related Posts
LawNet
What are support levels for damage from natural disasters, plant pests in Vietnam from February 25, 2025?
LawNet
Decree 18/2025/ND-CP providing guidance on the Law on Electricity related to electricity trading activities and ensuring power supply situations in Vietnam
LawNet
What is the significance of January 8? Which areas are prohibited from mineral activities in Vietnam?
LawNet
What are environmental protection tax rates for gasoline, oil, and lubricants in Vietnam January 1, 2025?
LawNet
What is the electricity transmission price until December 31, 2024 in Vietnam?
LawNet
Circular 35/2024/TT-BTNMT on technical procedures for the collection, transportation, and treatment of domestic solid waste in Vietnam
LawNet
Promulgation of the Law on Electricity 2024 in Vietnam from February 1, 2025
LawNet
Promulgation of the Law on Geology and Minerals 2024 in Vietnam
LawNet
Promulgation of the Law on Fire Prevention and Fighting and Rescue in 2024 in Vietnam
LawNet
Three cases of suspension due to failure to ensure fire prevention and fighting in Vietnam
Lượt xem: 0
Latest Post

Đơn vị chủ quản: Công ty THƯ VIỆN PHÁP LUẬT.
Chịu trách nhiệm chính: Ông Bùi Tường Vũ - Số điện thoại liên hệ: 028 3935 2079
P.702A , Centre Point, 106 Nguyễn Văn Trỗi, P.8, Q. Phú Nhuận, TP. HCM;