Based on Article 4 of Circular 10/2021/TT-BXD (Effective from October 15, 2021) which provides regulations on the monitoring of construction works during the exploitation and use period as follows:

  1. Civil engineering works, material production works, light industrial construction works, technical infrastructure works must be monitored during exploitation and use as specified in Appendix I of this Circular.

  2. The monitoring of construction works during exploitation and use is regulated in the maintenance procedure, including the following main contents:

    a) Monitoring subjects: the main load-bearing structures of the construction works (e.g., space frames, main load-bearing frames, stadium stands, chimneys, silos, etc.);

    b) Monitoring parameters (e.g., deformation, inclination, subsidence, cracks, sagging, etc.) and the limit values of these parameters; monitoring time; measurement cycle and other necessary contents.

  3. General requirements for monitoring construction works during exploitation and use:

    a) The monitoring contractor shall develop a monitoring plan in line with the contents specified in Clause 2 of this Article and submit it to the owner or the manager, user of the construction for approval;

    b) The monitoring contractor shall carry out monitoring according to the approved monitoring plan. The monitoring data must be analyzed and evaluated; monitoring results must be compared with the allowable design limit values and relevant technical regulations and standards.

In the case that the monitoring data exceed the allowable design limit values or there are abnormal signs, the owner or the manager, user of the construction must organize verification, assess the cause, and have measures to promptly rectify and address the issue.

Respectfully!

Related Posts
LawNet
What are support levels for damage from natural disasters, plant pests in Vietnam from February 25, 2025?
LawNet
Decree 18/2025/ND-CP providing guidance on the Law on Electricity related to electricity trading activities and ensuring power supply situations in Vietnam
LawNet
What is the significance of January 8? Which areas are prohibited from mineral activities in Vietnam?
LawNet
What are environmental protection tax rates for gasoline, oil, and lubricants in Vietnam January 1, 2025?
LawNet
What is the electricity transmission price until December 31, 2024 in Vietnam?
LawNet
Circular 35/2024/TT-BTNMT on technical procedures for the collection, transportation, and treatment of domestic solid waste in Vietnam
LawNet
Promulgation of the Law on Electricity 2024 in Vietnam from February 1, 2025
LawNet
Promulgation of the Law on Geology and Minerals 2024 in Vietnam
LawNet
Promulgation of the Law on Fire Prevention and Fighting and Rescue in 2024 in Vietnam
LawNet
Three cases of suspension due to failure to ensure fire prevention and fighting in Vietnam
Lượt xem: 0
Latest Post

Đơn vị chủ quản: Công ty THƯ VIỆN PHÁP LUẬT.
Chịu trách nhiệm chính: Ông Bùi Tường Vũ - Số điện thoại liên hệ: 028 3935 2079
P.702A , Centre Point, 106 Nguyễn Văn Trỗi, P.8, Q. Phú Nhuận, TP. HCM;