The Minister of Transportation officially approved the Planning for Pleiku Airport for the period 2021-2030, with a vision to 2050 in Vietnam

Planning  of  Pleiku  Airport  for  the  period  2021-2030,  vision  to  2050

Planning for Pleiku Airport for the period 2021-2030, vision to 2050 in Vietnam (Image from the Internet)

Planning for Pleiku Airport for the period 2021-2030, vision to 2050 in Vietnam

On September 5, 2024, the Minister of Transport of Vietnam issued Decision 1108/QD-BGTVT approving the Planning of Pleiku Airport for the period 2021-2030, vision to 2050 with the following contents:

(1) Position, function in the national airport and airfield network: A domestic airport.

(2) Nature of use: A joint-use civilian and military airport.

(3) Planning objectives:

* Period 2021-2030

- Airport level 4C (according to the standards of the International Civil Aviation Organization - ICAO) and military airport level II.

- Capacity: approximately 4.0 million passengers/year and 4,500 tons of cargo/year.

- Aircraft type operated: code C such as A320/A321 and equivalent.

- Landing approach method: CAT I heading 27 and simple heading 09.

* Vision to 2050

- Airport level 4C and military airport level II.

- Capacity: approximately 5.0 million passengers/year and 12,000 tons of cargo/year.

- Aircraft type operated: code C such as A320/A321 and equivalent.

- Landing approach method: CAT I heading 27 and simple heading 09.

(4) Planning items of the airfield:

* Runway system

- Period 2021-2030: Extend the existing runway to the East (heading 27) by approximately 600 m to become 3,000 m x 45 m, with dimensions and sidelines as per regulations in Vietnam.

- Vision to 2050: Maintain the runway configuration planned for the period 2021-2030.

* Taxiway system

- Period 2021-2030: Plan for 01 parallel taxiway, plan the connecting taxiways, and rapid exit taxiways to connect with the newly planned aircraft apron to the North, with dimensions and sidelines as per regulations.

- Vision to 2050: Plan additional connecting taxiways as needed, with dimensions and sidelines as per regulations in Vietnam.

* Aircraft apron

- Period 2021-2030: Plan an aircraft apron to the North of the runway, synchronized with the new civilian aviation area to accommodate approximately 14 parking positions.

- Vision to 2050: Plan expansions to accommodate approximately 18 parking positions, with reserves for further expansion as needed.

(5) Planning the general technical infrastructure system

* Internal airport roads

- Main access road to the Airport: Connect to the West via the proposed extended Pham Ngoc Thach road and to the North via the proposed supplemental road in the local plan.

- Internal airport roads: Plan roads connecting from the main road to the functional areas of the Airport.

- Service roads: Use the existing service roads, plan to supplement the service road system to ensure the security and safety operations of the Airport.

* Automobile parking system

- Period 2021-2030: Plan an automobile parking lot to the North of the new passenger terminal to meet operational capacity.

- Vision to 2050: Expand the parking lot to meet the operational capacity of the passenger terminals.

* Electricity supply system

Plan the electricity supply station on the land to the West of the new passenger terminal, synchronized with the civilian aviation area, covering approximately 4,000 m2; ensure operational needs, ability to increase capacity when needed; source electricity from Pleiku city’s grid.

* Water supply system

Plan the water supply station on the land to the Northwest of the new passenger terminal, synchronized with the civilian aviation area, covering approximately 2,000 m2; ensure operational needs, ability to increase capacity when needed; source water from Pleiku city’s water supply system.

* Drainage system

Plan the drainage canals, gutters, and ditches for the runway area, aircraft aprons, new taxiway areas, and the new civilian aviation area.

* Wastewater treatment system, Solid waste storage area, Hazardous waste area

Plan on the land to the East of the new passenger terminal covering approximately 2,000 m2, ensuring environmental protection requirements, with the ability to expand when needed.

(6) Land use planning

The total land use demand is 383.68 ha, including:

- Area managed by civilian aviation: 98.87 ha;

- Area managed by the military: 176.73 ha;

- Area jointly used by the military and civilian aviation: 108.08 ha.

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

0 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;