What Criteria Are Used to Determine the Classification of Construction Projects?
According to Clause 1, Article 2 of Circular 06/2021/TT-BXD (Effective from August 15, 2021), which stipulates the principles for determining the level of construction projects, specifically:
The level of construction projects specified in this Circular is determined based on the following criteria:
- Degree of importance, production scale: Applicable to each independent project or a combination of projects or a technological line comprising many items within the investment construction project as specified in Appendix I of this Circular;
- Structural scale: Applicable to each independent project within the investment construction project as specified in the structural types in Appendix II of this Circular.
Sincerely!
Does a warehouse for electronic components in Vietnam require the installation of an automatic fire suppression system?
Architecture practice certificate template in Vietnam
What is the application form for replacement of the Certificate of Land Use Rights in Vietnam?
Vietnam: What does the application for issuance of an architecture practicing certificate include?
Vietnam: What are the regulations on the cost estimate for the construction bid?
What are regulations on contents of the construction estimate in Vietnam?
Determination of construction contingencies by the work quantity calculated based on preliminary design in Vietnam
Does construction planning projects for communes in Vietnam include the strategic environmental assessment?
Fees for appraisal of technical design in Vietnam in 2020
Fees for appraisal of construction estimates in Vietnam in 2020