How is the Technical Plan for Construction Survey Regulated?
Article 27 of Decree 15/2021/ND-CP stipulates the technical plan for construction surveying as follows:
The surveying contractor shall develop a technical plan for construction surveying that is consistent with the construction surveying tasks.
Content of the technical plan for construction surveying;
a) Basis for developing the technical plan for construction surveying;
b) Components and volume of construction surveying work;
c) Methods, surveying equipment, and laboratories to be used;
d) Standards and technical regulations applicable to construction surveying;
e) Organization of implementation and quality control measures of the surveying contractor;
f) Implementation schedule;
g) Measures ensuring safety for personnel, equipment, technical infrastructure works, and other construction works in the survey area; environmental protection measures, landscape preservation in the survey area, and restoration of original conditions after the survey concludes.
- The project owner is responsible for verifying or hiring a consulting unit with adequate capacity to appraise the technical plan for construction surveying and to approve the technical plan for construction surveying according to the contract's regulations.
Respectfully!









