How are Architectural Technical Design Documents Regulated?

I would like to ask: According to legal regulations, how is the architectural technical design dossier stipulated? I hope to receive a response soon.

The architectural and technical design dossier is stipulated in Article 6 of Circular 03/2020/TT-BXD. To be specific:

- The content of the architectural and technical design dossier must conform to the basic design appraised and approved by the competent authority, clearly specifying technical parameters, materials, dimensions, and specific calculations for production, construction, and installation.

- Drawings include:

+ Location layout, site map for the construction area, current status map, boundary plan, planning information as per the approved plan;

+ General ground plan: illustrating the elements of the construction investment project, clearly specifying the new construction, renovation, refurbishment items based on the site status, determining the red line boundary, construction boundary, identifying entry and exit points, traffic flow division, technical indicators concerning the researched land area, construction area, construction density, total floor area, land usage coefficient, area of items, number of floors, internal traffic system, identifying boundary and positioning underground works;

+ Construction positioning drawings, floor plans, elevations, sections, workflow diagrams, and space organization;

+ Illustrative drawings: overall perspective, corner perspective, basic interior and exterior;

+ Dimension drawings, statistics of various types of doors, stairwells; area statistics, specifying materials, architectural colors of elevations, sanitation areas, floor tiling, finishing materials list;

+ Drawings of ancillary works and exterior of the building, fencing, greenery, gardens.

- Explanatory notes include:

+ Clearly stating the calculations for selecting technical plans, technological processes, material properties, clarifying the parameters which drawings cannot fully express, and ensuring sufficient basis for setting up the project's total cost estimate and construction design;

+ Contents stipulated in Clause 2, Article 5 of this Circular.

Sincerely.

Related Posts
LawNet
Guidelines on criteria for identifying temporary and dilapidated houses in Vietnam in 2025
LawNet
What is the template of Application for a construction permit for detached house in Vietnam in 2025?
LawNet
What is the template of the Application for reissue of construction permit for detached house in 2025 in Vietnam?
LawNet
What is the template of the Report for appraising the feasibility study for construction investment in accordance with Decree 175 in Vietnam?
LawNet
Promulgation of Circular 11/2024/TT-BXD on codes, title standards; standards and conditions for promotion consideration of public employees in the Construction sector in Vietnam
LawNet
Will the Urban and Rural Planning Law 2024 in Vietnam be effective from July 1, 2025?
LawNet
From January 1, 2025, will the district-level town Phong Dien beestablished under Hue city?
LawNet
From January 1, 2025, is it correct that Hue will become a central-affiliated city of Vietnam?
LawNet
Where is Ly Son Island? What are detailed regulations on striving for Ly Son island district to become a center by 2030?
LawNet
Promulgation of Circular 94/2024/TT-BQP providing detailed provisions on certain articles of the Law on Housing in the People's Army of Vietnam
Lượt xem: 0
Latest Post

Đơn vị chủ quản: Công ty THƯ VIỆN PHÁP LUẬT.
Chịu trách nhiệm chính: Ông Bùi Tường Vũ - Số điện thoại liên hệ: 028 3935 2079
P.702A , Centre Point, 106 Nguyễn Văn Trỗi, P.8, Q. Phú Nhuận, TP. HCM;