Detailed Urban Construction Planning at a 1/500 Scale Must Meet Which Requirements?

Editorial Board has received a query from Mr. Thanh Hung, currently working at an architecture company, as a new employee in the profession, he has some uncertainties and wishes to receive a response. To be specific: What requirements must an urban construction detailed planning at a scale of 1/500 meet?

The detailed urban construction planning at a 1/500 scale must adhere to the requirements specified in Section 1 of Decision 04/2008/QD-BXD on the national technical standards for construction planning issued by the Minister of Construction. Specifically:

In the detailed urban construction planning at a 1/500 scale, it is necessary to study and propose planning solutions to serve specific investment needs or investment policies, ensuring alignment with the overall development strategy and structure of the entire urban area. It must ensure coordination in the organization of space and technical infrastructure between the planned area and adjacent areas, ensuring uniformity, efficiency, and sustainability.

The detailed urban construction planning at a 1/500 scale must meet the approved specific objectives and tasks, as well as the following requirements:

- Propose solutions for organizing the spatial planning of architectural and landscape on the surface and underground construction space;

- Define the nature, function, primary economic-technical indicators regarding land use, social infrastructure, and technical infrastructure of the design area;

- Propose contents for land use planning, including: determining the area, construction density, and height of structures for each land plot; identify the scale of underground works;

- Propose solutions for planning the urban technical infrastructure system, including:

+ Traffic network: planning solutions for external traffic related to the design area, urban traffic (to each facility); cross-sections, road red lines, and construction boundaries of road routes (to internal roads); locations, scale of stations, parking lots, and underground works, technical tunnels...;

+ Water supply system: demand and water supply sources; the location and scale of plant facilities, water pump stations; reservoirs; water supply pipeline network to each facility and detailed technical specifications...;

+ Electricity supply system: electricity demand and supply sources; the location and scale of distribution substations; medium-voltage, low-voltage, and urban lighting grid...;

+ Drainage system: drainage network; location and scale of wastewater and solid waste treatment facilities...

- Urban design: propose urban design solutions that meet the control needs following the planning solutions of the project;

- Environmental impact assessment and propose environmental protection measures.

The editorial team responds with information to you.

Related Posts
LawNet
Guidelines on criteria for identifying temporary and dilapidated houses in Vietnam in 2025
LawNet
What is the template of Application for a construction permit for detached house in Vietnam in 2025?
LawNet
What is the template of the Application for reissue of construction permit for detached house in 2025 in Vietnam?
LawNet
What is the template of the Report for appraising the feasibility study for construction investment in accordance with Decree 175 in Vietnam?
LawNet
Promulgation of Circular 11/2024/TT-BXD on codes, title standards; standards and conditions for promotion consideration of public employees in the Construction sector in Vietnam
LawNet
Will the Urban and Rural Planning Law 2024 in Vietnam be effective from July 1, 2025?
LawNet
From January 1, 2025, will the district-level town Phong Dien beestablished under Hue city?
LawNet
From January 1, 2025, is it correct that Hue will become a central-affiliated city of Vietnam?
LawNet
Where is Ly Son Island? What are detailed regulations on striving for Ly Son island district to become a center by 2030?
LawNet
Promulgation of Circular 94/2024/TT-BQP providing detailed provisions on certain articles of the Law on Housing in the People's Army of Vietnam
Lượt xem: 0
Latest Post

Đơn vị chủ quản: Công ty THƯ VIỆN PHÁP LUẬT.
Chịu trách nhiệm chính: Ông Bùi Tường Vũ - Số điện thoại liên hệ: 028 3935 2079
P.702A , Centre Point, 106 Nguyễn Văn Trỗi, P.8, Q. Phú Nhuận, TP. HCM;