Amending Construction Design: Is Re-Evaluation Required?
According to Point b, Clause 3, Article 17 of Circular 18/2016/TT-BXD, it is stipulated that cases of design adjustments must undergo re-evaluation. To be specific:
Adjustments to construction design due to changes in geological conditions of the project, design load, structural solutions, materials used for load-bearing structures (except in cases where it enhances the safety of the project), and construction organization methods affecting the load-bearing safety of the project.
Thus, if your side adjusts the design for the above reasons, the revised design must be re-evaluated.
However, if design adjustments are made for other reasons, the revised design does not need to be re-evaluated.
Sincerely!

Guidelines on criteria for identifying temporary and dilapidated houses in Vietnam in 2025

What is the template of Application for a construction permit for detached house in Vietnam in 2025?

What is the template of the Application for reissue of construction permit for detached house in 2025 in Vietnam?

What is the template of the Report for appraising the feasibility study for construction investment in accordance with Decree 175 in Vietnam?

Promulgation of Circular 11/2024/TT-BXD on codes, title standards; standards and conditions for promotion consideration of public employees in the Construction sector in Vietnam

Will the Urban and Rural Planning Law 2024 in Vietnam be effective from July 1, 2025?

From January 1, 2025, will the district-level town Phong Dien beestablished under Hue city?

From January 1, 2025, is it correct that Hue will become a central-affiliated city of Vietnam?

Where is Ly Son Island? What are detailed regulations on striving for Ly Son island district to become a center by 2030?

Promulgation of Circular 94/2024/TT-BQP providing detailed provisions on certain articles of the Law on Housing in the People's Army of Vietnam