Steps for Safety Technical Inspection of Sliding Formwork Systems

On October 16, 2017, the Ministry of Construction issued Circular 11/2017/TT-BXD detailing specific steps for technical safety inspection of sliding formwork systems.

Circular 11 stipulates that for the inspection of hydraulic jacks, inspections will be carried out according to the current regulations on hydraulic lifting systems and inspection results.

For the inspection of sliding formwork systems, the inspection must be conducted sequentially according to the following steps:

- Preparation for inspection

- Check the records and equipment history;- Check the installation records.

- Conduct the inspection

- External examination;- Technical inspection - no-load test;- Technical inspection - load test.

- Handling the inspection results

See details in Circular 11/2017/TT-BXD effective from December 1, 2017.

-Thao Uyen-

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

0 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;