Deadline for Reporting Inspection Results in the Agriculture and Rural Development Sector

This is the important content mentioned in Circular 33/2016/TT-BNNPTNT regulating the order and procedures for conducting a specialized inspection and the attire, official inspection card for specialized inspection in agriculture and rural development.

To be specific, the reporting of inspection results and conclusions of specialized inspections in agriculture and rural development are regulated by Circular 33/2016/TT-BNNPTNT as follows:

- At the request of the Head of the inspection team, members of the inspection team must report on the results of the tasks assigned to them. The Head of the inspection team is responsible for presiding over the drafting of the inspection result report.- No later than 15 days from the end of the inspection, the Head of the inspection team must submit a written report on the inspection results to the person who issued the inspection decision, except in cases where the content of the inspection conclusion must await a professional conclusion from a competent agency or organization. The content of the inspection result report shall comply with Article 33 of Circular 05/2014/TT-TTCP.- The drafting of the inspection conclusion is carried out at the request of the person who issued the inspection decision. The content of the inspection conclusion shall comply with Article 35 of Circular 05/2014/TT-TTCP.

Refer to relevant provisions at Circular 33/2016/TT-BNNPTNT, effective from December 15, 2016.

- Thanh Lam -

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

0 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;