What are regulations on technical safety inspection report for industrial gas cylinders in Vietnam?

Please provide me with the technical safety inspection report for industrial gas cylinders in Vietnam. Thank you!

What are regulations on technical safety inspection report for industrial gas cylinders in Vietnam? - Image from Internet

Pursuant to Appendix 01 of the Technical Safety Inspection Procedure for Industrial Gas Cylinders issued with Circular 17/2021/TT-BLDTBXH (Effective from 01/01/2022) stipulating as follows:

APPENDIX 01

SAMPLE TECHNICAL SAFETY INSPECTION REPORT FOR INDUSTRIAL GAS CYLINDERS

(The name of the inspection organization)
-------

Socialist Republic of Vietnam
Independence - Freedom - Happiness
---------------

 

.............., daee......................…

 

TECHNICAL SAFETY INSPECTION REPORT FOR INDUSTRIAL GAS CYLINDERS
Number: ..........................

Based on the Technical Safety Inspection Procedure for Industrial Gas Cylinders, Document number QTKD: 06-2021/BLDTBXH issued with Circular number ............/2021/TT-BLDTBXH dated ..............., 2021 by the Ministry of Labor - Invalids and Social Affairs.

We, the undersigned:

Representative of the inspection organization:

1. ........................................Inspector registration number: ............................

2. ........................................Inspector registration number: ............................

Affiliated to the inspection organization: .............................................................

Registration certificate number of the inspection organization: ...............................

Members witnessing the inspection and approving the inspection report:

1. .............................................................Position: ...................................

2. .............................................................Position: ...................................

We have conducted an inspection for the (equipment name): ...........................................

Owned/managed by (name of organization, individual owning/managing the cylinder): .........

........................................................................................................................

Address (headquarters of the facility): ................................................................

Address (installation location): ................................................................................

I - BASIC PARAMETERS OF THE CYLINDER

- Name and address of the manufacturer: ............................................................

- Manufactured month, year: ................................................................

- Cylinder batch manufacturing number: ............................................................

- Quantity and list of inspected sample cylinders: ....................................................

- Brand name stamped on the cylinder: ............................................................

- Working pressure: ............. bar Test pressure: ............. bar.

- Capacity: ............. liters Tare weight of the cylinder: ............. kg.

- Purpose: ................................................................................................................

- Previous inspection report number (if any): ............. Date: ............. conducted by (name of inspection organization): ............................................................

II - INSPECTION METHOD

Inspection  Extraordinary  Periodic  Initial

- Reason for extraordinary inspection (if any): ............................................................

III - INSPECTION CONTENT

1. Check records and background information:

Criteria

Assessment

Yes

No

Personal history file of the cylinder

   

Technical dossier of the manufacturer (Applicable for initial inspections, evaluated according to point a, section 1, Article 8 of the Technical Safety Inspection Procedure QTKĐ: 06-2021/BLDTBXH)

   

Factory production record of the cylinder (Applicable for initial inspections, evaluated according to point a, section 1, Article 8 of the Technical Safety Inspection Procedure QTKĐ: 06-2021/BLĐTBXH)

   

Previous inspection records: Inspection report and Certificate of inspection results from the previous inspection

(Not applicable for initial inspections)

   

Records of usage, maintenance, inspection reports, and checks (if available)

   

Design and repair documentation, acceptance report after repair with replacement of pressure-bearing components by welding (if available)

   

Other relevant documents (if available)

(Specify any accompanying documents in this section)

   

Evaluation of results:

- Comments: ..................................................................................................................

- Evaluation of results: Complete ⬜ Incomplete ⬜

2. External technical inspection

- Comments: ..................................................................................................................

.......................................................................................................................................

- Specifications marked on the cylinder: .............................................................................

- Defects - deformations: ...................................................................................................

- Evaluation of results: Achieved  Not achieved 

3. Internal technical inspection

- Comments: ..................................................................................................................

.......................................................................................................................................

- Tightness of the valve and safety components (if applicable) of the cylinder: ....................

- Condition of metal surface, welds (not applicable for dissolved acetylene cylinders): .....

- Condition of porous material (for dissolved acetylene cylinders): ....................................

- Evaluation of results: Achieved  Not achieved 

4. Testing:

Content

Test substance

Test pressure

(bar)

Duration

(minute)

Durability test

     

Volume expansion test

     

Leak test

     

- Comments: ...................................................................................................................

- Evaluation of results: Achieved  Not achieved 

IV - CONCLUSION AND RECOMMENDATIONS

1. The batch (number of cylinders) has been inspected and the result is: Achieved

2. Inspection marking has been applied at the location: .................................................

3. Working pressure: ........................ bar.

4. Recommendations: ......................................................................................................

5. Timeline for implementing recommendations: .............................................................

V - INSPECTION PERIOD

Periodic inspection date: .................................................

The report was prepared on: date....................................

At (Specify the location of the inspection): .................................................................

1- In the case of inspection at the inspection station:

STATION MANAGER
(Signature, full name)

INSPECTOR
(Signature, full name)

TECHNICIAN
(Signature, full name)

2- In the case of inspection at the facility:

ORGANIZATION/INDIVIDUAL OWNING/MANAGING THE CYLINDER
(Signature and stamp)

WITNESS
(Signature, full name)

INSPECTOR
(Signature, full name)

Best regards!

Related Posts
LawNet
What are holidays of Vietnam in March 2025? Which days are employees in Vietnam entitled to days off?
LawNet
Can a member be expelled from the Union for not paying union dues in Vietnam?
LawNet
What is the latest region-based statutory minimum wage in Vietnam for 2025?
LawNet
How long can a member fail to pay union dues before facing disciplinary action in the form of a warning in Vietnam?
LawNet
What is the the template of the Collective Labor Agreement in 2025 in Vietnam?
LawNet
Are union members in Vietnam liable to disciplinary action for not paying union fees?
LawNet
What is the latest template for Resignation Letter in 2025 in Vietnam?
LawNet
Can individuals with reduced working capacity withdraw lump-sum social insurance in Vietnam?
LawNet
Are employees in Vietnam required to work during the Lunar New Year 2025?
LawNet
How many annual leave days do employees in Vietnam have? What are regulations on salary for unused annual leave in Vietnam?
Lượt xem: 0
Latest Post

Đơn vị chủ quản: Công ty THƯ VIỆN PHÁP LUẬT.
Chịu trách nhiệm chính: Ông Bùi Tường Vũ - Số điện thoại liên hệ: 028 3935 2079
P.702A , Centre Point, 106 Nguyễn Văn Trỗi, P.8, Q. Phú Nhuận, TP. HCM;