What are regulations on technical requirements for airport and aviation port planning in Vietnam?

What are regulations on technical requirements for airport and aviation port planning in Vietnam?

What are regulations on technical requirements for airport and aviation port planning in Vietnam? - Image from Internet

Based on Appendix IV issued together with Circular 33/2021/TT-BGTVT, the technical requirements for airport and aviation port planning are as follows:

Airport and aviation port planning is organized according to each airport and aviation port that has been planned in the overall development plan for the national airport and aviation port system (national sector planning) during the same planning period.

The planning content is regulated in accordance with the Law amending and supplementing some articles of 37 related laws, including Planning Law No. 35/2018/QH14 dated November 20, 2018, and Decree No. 05/2021/NĐ-CP dated January 25, 2021 of the Government on management and operation of airports and aviation ports.

- Analyze and evaluate natural conditions, current land use, population, technical infrastructure, and topography; evaluate projects and plans that have been or are being implemented in the area.

- Conduct surveys, investigations, data collection, and demand forecasting.

- Determine the feasibility of airport planning; determine the nature, role, scale of the airport, land use indicators, and technical infrastructure for the entire planning area.

- Plan the overall land use: determine the location and boundaries of functional areas within the planning area.

- Plan the general technical infrastructure system: the technical infrastructure system is arranged up to the internal road network of the airport, including determining the internal and external airport traffic network, road cross-sections; determine water supply needs and sources; location and scale of factory buildings, pumping stations; water supply pipeline network and detailed technical specifications; determine energy usage needs and supply sources; location and scale of power distribution stations, gas stations; conduit and lighting network; determine drainage needs and network; determine communication infrastructure needs and network.

- Position and scale of the aviation infrastructure items; take-off and landing directions.

- Position of infrastructure items ensuring flight operations.

- Position and scale of aviation service facilities in each functional area including passenger terminals; cargo terminals, warehouses, cargo consolidation areas; aviation fuel supply facilities; ground technical facilities; in-flight meal supply facilities; aircraft storage, repair, maintenance facilities; refueling stations for vehicles and aviation equipment; inspection stations for vehicles and aviation equipment; aviation technical facilities; aviation security ensuring facilities; wastewater treatment system, solid waste storage area, hazardous waste area, communication infrastructure; location and scale of environmental protection infrastructure, other landscape facilities (if any).

- Position and scale of non-aviation service facilities, other facilities including office areas of agencies, units operating at the airport, aviation port; medical isolation areas for international airports.

- Position and scale of aviation security ensuring facilities, emergency and rescue systems.

- Airspace planning, flight routes, and flight methods for airport operations.

- Air obstacle limitation surfaces, noise maps according to the planning.

- Wastewater treatment system, solid waste storage area, hazardous waste area in accordance with environmental protection laws and related environmental impacts.

- Boundary landmark maps according to airport and aviation port planning.

- Investment estimates and phased construction.

- Maps, drawings

- Map showing the location of the airport and aviation port planning in the national airport and aviation port system, with a minimum scale of 1:1,000,000;

- Map of air obstacle limitation surfaces, noise maps according to the planning, with a minimum scale of 1:50,000 based on topographic maps;

- Planning maps of related works and technical infrastructure with a minimum scale of 1:2,000 based on topographic maps.

Best regards!

Related Posts
LawNet
Is it possible to revoke driver licenses of motorcyle operatores who do not use headlights from 7pm in Vietnam?
LawNet
Vietnam: Are persons suffering from congenital nystagmus eligible to take the driving test for a Class A1 driving license?
LawNet
Airport/aerodrome registration certificate template in Vietnam
LawNet
Vietnam: May persons suffering from hemeralopia take the driving tests for Class B1 driving license?
LawNet
Vietnam: May motorcyclists using the high beam in urban areas be suspended from driving licenses?
LawNet
Vietnam: Certificate template of airport/aerodrome operation
LawNet
Vietnam: Is a person whose one hand is amputated eligible to apply for a motorcycle driving license?
LawNet
Vietnam: Is a person whose one finger segment is amputated eligible to apply for a motorcycle driving license?
LawNet
Regulations on advertisement at airports/aerodromes in Vietnam
LawNet
Procedures for ensuring traffic safety for automobiles transport business units in Vietnam
Lượt xem: 0
Latest Post

Đơn vị chủ quản: Công ty THƯ VIỆN PHÁP LUẬT.
Chịu trách nhiệm chính: Ông Bùi Tường Vũ - Số điện thoại liên hệ: 028 3935 2079
P.702A , Centre Point, 106 Nguyễn Văn Trỗi, P.8, Q. Phú Nhuận, TP. HCM;