08:14 | 04/09/2024

Procedure for Conversion of Construction Planning Design Practice Certificate

Regarding my case, I have been granted a certificate of practicing urban planning design abroad. Now that I have returned to Vietnam for a long-term job (more than 1 year), I need to convert my certificate of practicing urban planning design. So, according to the current regulations, what is the procedure for converting the certificate of practicing urban planning design?

Legal Basis:

- Law on Construction 2014;- Decree 15/2021/ND-CP;- Decree 100/2018/ND-CP;- Circular 38/2022/TT-BTC;- Amended Law on Construction 2020.

According to the current legal provisions, foreign individuals or Vietnamese residing abroad who possess a practicing certificate in construction planning design issued by a foreign agency or organization, if practicing construction planning design in Vietnam for less than 06 months, are recognized for practicing. In case an individual practices construction planning design in Vietnam for 06 months or more, he/she must convert the practicing certificate at the competent authority according to the law.

The specific procedure for converting the Construction Planning Design Practicing Certificate is as follows:

1. Conditions for conversion:

Foreign individuals or Vietnamese residing abroad who have a practicing certificate in construction planning design issued by a foreign agency or organization, if practicing construction planning design in Vietnam for 06 months or more, must convert the practicing certificate at the competent authority according to the law.

2. Dossier for conversion:

Include:

- Application form for converting the construction planning design practicing certificate, 02 color photos size 4 x 6 cm with a white background portrait of the applicant taken within the last 06 months;

- A copy of the degree, the practicing certificate in construction planning design issued by a foreign agency or organization, legalized, translated into Vietnamese, and notarized, authenticated as per Vietnamese law;

- A certified copy or a file containing a color photo taken from the original or a copy presented together with the original for comparison of legal residence documents or work permits issued by a competent Vietnamese authority as per regulations.

3. Conversion process:

- Individuals shall send 01 set of documents requesting the conversion of the Construction Planning Design Practicing Certificate via online, postal service, or directly to the competent authority issuing the Construction Planning Design Practicing Certificate.

- Within 25 days from the date of receipt of a complete and valid dossier, the competent authority shall issue the Construction Planning Design Practicing Certificate;

Note: In case the dossier is incomplete or not valid, the competent authority issuing the Construction Planning Design Practicing Certificate must notify once in writing to the individual requesting the conversion within 05 days from the date of receipt of the application.

4. Authority for conversion:

- Grade I: Specialized construction agency under the Ministry of Construction.

- Grade II and Grade III: Department of Construction; or a recognized professional-social organization qualified to issue the Construction Practicing Certificate to its members.

5. Processing time: 25 days from the date of receipt of a complete and valid dossier.

6. Conversion fee: 150,000 VND (One hundred fifty thousand) per certificate.

7. Validity of the Construction Planning Design Practicing Certificate: The validity shall be determined according to the duration stated in the work permit or temporary residence card issued by the competent authority, but not exceeding 05 years.

For information on the conditions, standards, dossiers, and procedures for other practicing certificates, please refer to: Certificate Lookup.

The above is our advisory opinion on the issue you are inquiring about.

Respectfully!

Related Posts
LawNet
Where to Apply for an Investment Registration Certificate When a Project is Implemented Both Inside and Outside the Industrial Park?
LawNet
Where Must a Company Apply for an Investment Registration Certificate?
LawNet
Does the Company Need to Apply for an Investment Registration Certificate?
LawNet
Principles for Payment of State's Capital Contribution in PPP Projects
LawNet
The State Capital Contribution in PPP Projects
LawNet
Investor Profits in the Implementation of PPP Projects
LawNet
Interest Rates for Mobilizing Investment Capital in Implementing PPP Projects
LawNet
Procedure for Upgrading Second-Class Construction Capacity Certificates
LawNet
Criteria for Determining the Investor's Equity in Implementing PPP Projects
LawNet
Content of the Financial Plan for the PPP Project
Lượt xem: 0
Latest Post

Đơn vị chủ quản: Công ty THƯ VIỆN PHÁP LUẬT.
Chịu trách nhiệm chính: Ông Bùi Tường Vũ - Số điện thoại liên hệ: 028 3935 2079
P.702A , Centre Point, 106 Nguyễn Văn Trỗi, P.8, Q. Phú Nhuận, TP. HCM;