Recently, the Ministry of Industry and Trade of Vietnam has issued Circular No. 23/2013/TT-BCT regulating the contents and order to formulate, appraise and approve the design of construction of nuclear power plant.

According to Article 3 of Circular No. 23/2013/TT-BCT of the Ministry of Industry and Trade of Vietnam, design of construction of nuclear power plant includes the following 04 steps:

Chưa nên làm điện hạt nhân ở Việt Nam

- Basic design is done in the stage of formulation of works construction investment project, ensuring to show the main technical parameters in conformity with the applied regulations and standards and as a basis for deploying the following steps of design;

- Technical design is done on the basis of basic design in projects of works construction investment approved, ensuring to fully show the technical parameters and materials used in conformity with applied regulations and standards and as a basis for deploying the design of technical drawing;

- Design of working drawing is the design ensuring to show full technical parameters, materials used and structure details in accordance with the applied regulations and standards; ensuring the eligibility for implementation of works construction.

- Other steps of design according to international practice submitted by the contractor to the investor for review and approval.

View details at Circular No. 23/2013/TT-BCT of the Ministry of Industry and Trade of Vietnam, effective from December 01, 2013.

Thu Ba

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

24 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;