Method of Lowest Bid Evaluation for Bidding Documents for Consulting Service Packages: When Is It Applied?
How to combine technical and price evaluation methods for non-consulting service bidding documents?
Based on Clause 3, Article 58 of Bidding Law 2023 which stipulates the method of combining technical and price evaluation for non-consulting service bidding packages, it includes:
- The evaluated price is the bid price after correcting errors, adjusting discrepancies as required by the bidding documents, subtracting the discount value (if any), adding elements to convert to the same basis for the entire lifecycle of the goods, works, or non-consulting services.
- The evaluated price is used to rank the bidding documents for non-consulting and mixed packages applying the form of open bidding, restricted bidding, or competitive quotation.
- The evaluated price method applies to packages where the conversion costs can be on the same basis regarding technical, financial, commercial factors for the entire lifecycle of the goods, works, or non-consulting services.
- One or more elements converted to the same basis to determine the evaluated price include: Necessary operating costs, maintenance, and other costs related to interest rates, timelines, quality of goods, services, or construction works under the package.
- Capacity, efficiency; results of statistics, evaluation of executing similar contracts previously, including considering the origin.
- Sustainable bidding and other factors.
- The contractor with the lowest evaluated price is ranked first.
When is the lowest price evaluation method applied for consulting service bidding documents?
When is the lowest price evaluation method applied for consulting service bidding documents?
According to Clause 1, Article 59 of Bidding Law 2023 which stipulates the evaluation method for consulting service bidding packages as follows:
Evaluation method for consulting service bidding packages
1. Lowest Price Method:
a) The lowest price method applies to simple consulting packages, consulting packages with clear implementation procedures according to available standards;
b) The contractor with a bidding document meeting the technical requirements, having the lowest bid price after correcting errors, adjusting discrepancies, and subtracting the discount value (if any) is ranked first.
...
Therefore, the lowest price evaluation method for consulting service bidding packages is applied when the packages are simple, with clear implementation procedures according to a sequence or available standards.
Note: The contractor meeting the technical requirements, having the lowest bid price after contractual modifications will be ranked according to the first evaluation method.
What are the conditions for a contractor as an organization to win the bid for consulting service bidding?
According to Clause 1, Article 60 of Bidding Law 2023 which stipulates the conditions for a contractor to win the bid for consulting service packages as follows:
Conditions for winning the bid for consulting service bidding
1. The consulting contractor as an organization is considered for the winning proposal when meeting the following conditions:
a) Having a valid bidding document, a valid proposal;
b) Having a technical proposal meeting the requirements of the bidding documents, request documents;
c) For the lowest price method: having the lowest bid price after correcting errors, adjusting discrepancies, subtracting the discount value (if any); for the package applying a lump-sum contract type, having the lowest bid price after subtracting the discount value (if any); for the fixed price method and the method based on technique: having the highest technical score; for the method of combining technique and price: having the highest composite score;
d) Having a proposed winning price not exceeding the approved package price.
...
Thus, the conditions for a contractor as an organization to win the bid for consulting service bidding are regulated, including:
- Having a valid bidding document, a valid proposal.
- Having a technical proposal meeting the requirements of the bidding documents, request documents.
- For the lowest price method:
+ Having the lowest bid price after correcting errors, adjusting discrepancies, subtracting the discount value (if any).
+ For the package applying a lump-sum contract type, having the lowest bid price after subtracting the discount value (if any).
+ For the fixed price method and the method based on technique: Having the highest technical score.
+ For the method of combining technique and price: Having the highest composite score.
- Having a proposed winning price not exceeding the approved package price.
Note: Bidding Law 2023 will be effective from January 1, 2024