323916

Circular No. 19/2016/TT-BCT dated September 14, 2016, energy consumption norms in beer and beverage production industry

323916
Tax
LawNet .vn

Circular No. 19/2016/TT-BCT dated September 14, 2016, energy consumption norms in beer and beverage production industry

Sign: 19/2016/TT-BCT Document type: Circular
Promulgation place: The Ministry Of Industry And Trade Signer: Hoang Quoc Vuong
Promulgation day: 14/09/2016 Effect day: Known
Announcement day: Updating Announcement number: Updating
Status: Known
Sign: 19/2016/TT-BCT
Document type: Circular
Promulgation place: The Ministry Of Industry And Trade
Signer: Hoang Quoc Vuong
Promulgation day: 14/09/2016
Effect day: Known
Announcement day: Updating
Announcement number: Updating
Status: Known

LawNet .vn
Original document
(No content)
You Are Not Logged In Account!

Because you are not logged in, you could only view Property of Document. You couldnot view Effect of Document, Document Related, Document alternative, Original document, English documents,...

If you don't have Account yet, please register Account here
English documents
(No content)
LawNet .vn

MINISTRY OF INDUSTRY AND TRADE
--------

SOCIALIST REPUBLIC OF VIETNAM
Independence – Freedom - Happiness

---------------

No. 19/2016/TT-BCT

Hanoi, September 14, 2016

 

CIRCULAR

ENERGY CONSUMPTION NORMS IN BEER AND BEVERAGE PRODUCTION INDUSTRY

Pursuant to the Government's Decree No. 95/2012/ND-CP dated November 12, 2012, defining the functions, tasks, powers and organizational structure of the Ministry of Industry and Trade

Pursuant to the Law on Economical and Efficient Use of Energy dated June 28, 2010;

Pursuant to the Government’s Decree No. 21/2011/ND-CP dated March 29, 2011 detailing the implementation of the Law on Economical and Efficient Use of Energy;

At the request of general director of General Directorate of Energy;

The Minister of Industry and Trade promulgates regulations on energy consumption norms for beer and beverage production industry as follows:

Chapter I

...

...

...

Please login or register Member Pro here to see the full English Document.



Article 1. Governing scope

This Circular stipulates:

1. Energy consumption norms in beer and beverage production facilities in the period to the end of 2020 and the period from 2021 to the end of 2025.

2. Method for determination of specific energy consumption in beer and beverage production facilities.

3. This Circular is inapplicable to purified and mineral water products.

Article 2. Regulated entities

1. Facilities, organizations and/or individuals engaging in beer and beverage production industry.

2. Other relevant agencies, organizations, and individuals.

Article 3. Interpretation of terms

...

...

...

Please login or register Member Pro here to see the full English Document.



2. Energy consumption norms refer to specific energy consumption index in proportion to each period stipulated by the Ministry of Industry and Trade in this Circular.

3. One hectoliter (1 hl) is a unit of capacity equal to 100 liters (100 l).

Chapter II

ENERGY CONSUMPTION NORMS AND MEASURES OF INCREASING EFFICIENCY IN ENERGY USE IN BEER AND BEVERAGE PRODUCTION INDUSTRY

Article 4. Determination of specific energy consumption

1. SEC in beer production industry shall be determined according to the method mentioned in Annex I.

2. SEC in beverage production industry shall be determined according to the method mentioned in Annex II.

Article 5. Energy consumption norms for beer and beverage production industry in the period to 2025

1. Period to the end of 2020:

...

...

...

Please login or register Member Pro here to see the full English Document.



Industry

 

Norms (MJ/hl)

 

Capacity (million liters)

 

1

Beer

> 100

...

...

...

Please login or register Member Pro here to see the full English Document.



20 - 100

215

< 20

306

 

Type of production

 

2

Beverage

...

...

...

Please login or register Member Pro here to see the full English Document.



55

Still

111

2. Period from 2021 to the end of 2025:

No.

Industry

 

Norms (MJ/hl)

 

...

...

...

Please login or register Member Pro here to see the full English Document.



 

1

Beer

> 100

129

20 - 100

196

< 20

286

...

...

...

Please login or register Member Pro here to see the full English Document.



Type of production

 

2

Beverage

Fizzy or both fizzy and still

52

Still

107

Article 6. Requirements for energy consumption norms in the period to the end of 2025

...

...

...

Please login or register Member Pro here to see the full English Document.



2. In case SEC of production facilities is higher than energy consumption norms in proportion to each period, the production facilities shall establish and implement measures to increase efficiency in energy use to satisfy requirements as prescribed in Clause 1, Clause 2, Article 5 herein.

3. SEC of investment projects or projects on renovation and expansion shall not be allowed to be higher than energy consumption norms as prescribed in Clause 2, Article 5 herein.

Article 7. Measures to increase efficiency in energy use in beer and beverage production industry

1. Management measures:

a. Increase management of activities of using energy in facilities;

b. Construct and maintain energy management system in facilities.

2. Technical and technological measures include:

a. Optimize technology process;

b. Use energy efficient equipment;

...

...

...

Please login or register Member Pro here to see the full English Document.



Chapter III

IMPLEMENTATION

Article 8. Responsibility of General Directorate of Energy

1. Preside over and cooperate with relevant agencies in instructing and organizing supervision, inspection of implementation of this Circular;

2. General Directorate of Energy shall cooperate with the Service of Industry and Trade across the country in inspecting the implementation of energy consumption norms, feasibility of the plans to ensure energy norms as scheduled (if need be).

3. Based on the results of inspection, General Directorate of Energy shall make the report to the Minister of Industry and Trade on cases of failing to comply with Article 5 herein and propose penalties according to applicable regulations.

Article 9. Responsibility of the Service of Industry and Trade

1. Cooperate with General Directorate of Energy in instructing and speeding up inspection of economical and efficient use of energy under this Circular.

2. Annually, preside over inspection of implementation of energy consumption norms, feasibility of the plans to ensure energy norms as scheduled for production facilities in localities.

...

...

...

Please login or register Member Pro here to see the full English Document.



Article 10. Responsibility of production facilities, relevant organizations and/or individuals

1. Organizations and/or individuals engaging in beer and beverage production industry shall have plans to meet requirements as prescribed in Article 5 herein.

2. Before January 15 annually, production facilities shall be responsible for reporting the implementation of energy consumption norms as prescribed in Annex VI enclosed herewith to the Ministry of Industry and Trade through the Service of Industry and Trade, General Directorate of Energy.

3. Production facilities that fail to meet energy consumption norms as prescribed and fail to propose feasible plans to ensure the norms as scheduled in Article 5 herein shall be subject to penalties according to applicable regulations.

Article 12. Effect

1. This Circular takes effect since November 01, 2016.

2. Any project that has had the investment policy decision issued by competent agencies after the effective date of this Circular shall meet provisions set out in Clause 2, Article 5 herein.

3. Difficulties that arise during the implementation of this Circular shall be reported to the Ministry of Industry and Trade for amendments./.

 

...

...

...

Please login or register Member Pro here to see the full English Document.



PP THE MINISTER
DEPUTY MINISTER




Hoang Quoc Vuong

 

ANNEX I

METHOD FOR DETERMINATION OF SPECIFIC ENERGY CONSUMPTION IN BEER PRODUCTION FACILITIES (Enclosed with the Minister of Industry and Trade’s Circular No. 19/2016/TT-BCT dated September 14, 2016)

1. Scope of assessment: beer production areas (not including administrative areas and other production areas).

2. The time for determination of SEC (herein ‘SEC determination time) in facilities shall be one year (from January 01 to December 31). If examination and verification of SEC is required, the time for doing so shall be equal to the time required for completion of a production cycle.

3. Parameters to determine SEC in beer production facilities:

Table 1.1 Data for determination of SEC in beer production facilities

Factors

...

...

...

Please login or register Member Pro here to see the full English Document.



Unit

e1

Amount of electricity consumed in production areas during SEC determination time

kWh

e

Amount of electricity consumed throughout the facility (in case e1 cannot be determined) for facilities with production and administrative areas only (without other energy consumption areas)

kWh

t1

Amount of fuel consumed in production areas during SEC determination time

...

...

...

Please login or register Member Pro here to see the full English Document.



t1 - coal

Amount of coal consumed in production areas during SEC determination time

Tonne and type

t1 (FO)

Amount of fuel oil consumed in production areas during SEC determination time

Tonne or 1,000L

t1 (Diesel)

Amount of diesel consumed in production areas during SEC determination time

Tonne or 1,000L

...

...

...

Please login or register Member Pro here to see the full English Document.



Amount of LPG consumed in production areas during SEC determination time

Tonne

t1 (steam)

Amount of steam consumed (sought from outside sources) in production areas during SEC determination time

Tonne and pressure

t1 (other types of fuel)

Amount of other types of fuel (fire wood or biomass) consumed in production areas during SEC determination time Not including renewable energy (solar energy, biogas, wind energy…)

Tonne and type of fuel

p

...

...

...

Please login or register Member Pro here to see the full English Document.



hl

p1

Output of bottled beer during SEC determination time

hl

p2

Output of canned beer during SEC determination time

hl

p3

Output of draught beer during SEC determination time

...

...

...

Please login or register Member Pro here to see the full English Document.



4. Equivalent product: equivalent product in beer production facilities are bottled beer products. Other beer products shall be converted to bottled beer products in order to calculate SEC.

5. SEC in beer production facilities shall be determined in Formula 1.1 as follows:

SEC production facilities = +  [MJ/hl]                          (Formula 1.1)

Where:

- E1: Equivalent electrical energy consumed in production areas during the period of survey, MJ;

- T1: Equivalent thermal energy consumed in production areas during the period of survey, MJ;

- P (e): Output of equivalent product (electricity-based), hl;

- P (t): Output of equivalent product (heat-based), hl;

6. Determination of E1, T1, P(e) and P(t):

...

...

...

Please login or register Member Pro here to see the full English Document.



Electrical energy consumed in production areas (e1) during the period of survey shall be converted to unit of measurement (MJ) as follows:

E1 = e1 x 3.6                 [MJ]                                          (Formula 1.2)

Where:

- E1: Equivalent electrical energy consumed in production areas during the period of survey (MJ);

- e1: Amount of electricity consumed in production areas during the period of survey (MJ);

- 3.6 (MJ/kWh): conversion factor.

If beer production facilities do not have figures e1, transport activities, canteens and produce beer only, e1 shall be calculated according to the amount of electricity consumed throughout the facility e as follows:

e1 = 0.95 x e                 [kWh]                                        (Formula 1.3)

Where:

...

...

...

Please login or register Member Pro here to see the full English Document.



- e: Electrical energy consumed throughout the facility during the period of survey (kWh);

- 0.95: conversion factor

b) Determination of thermal energy T1

Thermal energy consumed in production areas (T1) during the period of survey shall be converted to unit of measurement (MJ) as follows:

T1 = Σt1(fuel i) x k(fuel i)             [MJ]                              (Formula 1.4)

Where:

- T1: Amount of equivalent thermal energy consumed in production areas during the period of survey (MJ);

- t1 (fuel ): amount of fuel consumed in production areas during the period of survey;

- k (fuel i): conversion factor as prescribed in Table 1.2.

...

...

...

Please login or register Member Pro here to see the full English Document.



Fuel

Type

Unit

Conversion factor, MJ/unit

t1 (coal)

Coal dust 1.2

Tonne

29.309

Coal dust 3.4

...

...

...

Please login or register Member Pro here to see the full English Document.



25.122

Coal dust 5.6

Tonne

20.935

t1 (DO)

DO

Tonne

42.707

 

...

...

...

Please login or register Member Pro here to see the full English Document.



36.846

t1 (FO)

FO

Tonne

41.451

 

1,000L

39.358

t1 (LPG)

...

...

...

Please login or register Member Pro here to see the full English Document.



Tonne

45.638

t1 (steam)

Steam (absolute pressure 6 bar)

Tonne

3.674

Steam (absolute pressure 7 bar)

Tonne

3.681

...

...

...

Please login or register Member Pro here to see the full English Document.



Tonne

3.690

Steam (absolute pressure 9 bar)

Tonne

3.696

t1 (other types of fuel)

Firewood/rice hulls/biogas

Tonne

15.600

...

...

...

Please login or register Member Pro here to see the full English Document.



Tonne

11.600

c) Determination of output of equivalent product P(e) and P(t)

Output of equivalent product P(e) is calculated as follows:

P(e) = p1 + p2x0.72 + p3x0.91                [hl]                    (Formula 1.5)

Where:

        - P(e): Output of equivalent product (for electrical energy) during the period of survey (hl)

- p1: Output of bottled beer during the period of survey (hl);

- p2: Output of canned beer during the period of survey (hl);

...

...

...

Please login or register Member Pro here to see the full English Document.



- 0.72: Conversion factor (for electrical energy) from canned beer to bottle beer;

- 0.91: Conversion factor (for electrical energy) from draught beer to bottle beer;

Output of equivalent product P(t) is calculated as follows:

P(t) = p1 + p2x0.59 + p3x0.88                 [hl]                    (Formula 1.6)

Where:

- P(t): Output of equivalent product (for thermal energy) during the period of survey (hl);

- p1: Output of bottled beer during the period of survey (hl);

- p2: Output of canned beer during the period of survey (hl);

- p3: Output of draught beer during the period of survey (hl);

...

...

...

Please login or register Member Pro here to see the full English Document.



- 0.88: Conversion factor (for thermal energy) from draught beer to bottle beer;

 

ANNEX II

METHOD FOR DETERMINATION OF SPECIFIC ENERGY CONSUMPTION IN BEVERAGE PRODUCTION FACILITIES (Enclosed with the Minister of Industry and Trade’s Circular No. 19/2016/TT-BCT dated September 14, 2016)

1. Scope of assessment: beverage production areas (not including administrative areas and other production areas).

2. The time for determination of SEC in facilities shall be one year (from January 01 to December 31). If examination and verification of SEC is required, the time for doing so shall be equal to the time required for completion of a production cycle.

3. Parameters to determine SEC in beverage production facilities:

Table 2 Data for determination of SEC in beverage production facilities

Parameter

...

...

...

Please login or register Member Pro here to see the full English Document.



Unit

e1

Amount of electricity consumed in production areas during SEC determination time

kWh

e

Amount of electricity consumed throughout the facility (in case e1 cannot be determined) for facilities with production and administrative areas only (without other energy consumption areas)

kWh

t1

Amount of fuel consumed in production areas during SEC determination time

...

...

...

Please login or register Member Pro here to see the full English Document.



t1 - coal

Amount of coal consumed in production areas during SEC determination time

Tonne and type

t1 (FO)

Amount of FO consumed in production areas during SEC determination time

Tonne or 1,000 liters

t1 (Diesel oil)

Amount of diesel oil consumed in production areas during SEC determination time

Tonne or 1,000 liters

...

...

...

Please login or register Member Pro here to see the full English Document.



Amount of LPG consumed in production areas during SEC determination time

Tonne

t1 (steam)

Amount of steam consumed (sought from outside sources) in production areas during SEC determination time

Tonnes and pressure

t1 (other types of fuel)

Amount of other types of fuel (fire wood or biomass) consumed in production areas during SEC determination time Not including renewable energy (solar energy, biogas, wind energy…)

Tonne and type

p

...

...

...

Please login or register Member Pro here to see the full English Document.



hl

p1

Output of fizzy beverage during SEC determination time

hl

p2

Output of still beverage during SEC determination time

hl

p3

Output of beverage contained in glass bottles during SEC determination time

...

...

...

Please login or register Member Pro here to see the full English Document.



p4

Output of beverage contained in glass bottles during SEC determination time

hl

p5

Output of canned beverage during SEC determination time

hl

p6

Output of packaged beverage during SEC determination time

hl

...

...

...

Please login or register Member Pro here to see the full English Document.



5. SEC in beverage production facilities shall be determined in Formula 2.1 as follows:

SEC production facilities = +            [MJ/hl]                          (Formula 2.1)

Where:

- E1: Equivalent electrical energy consumed in production areas during the period of survey (MJ);

- T1: Equivalent thermal energy consumed in production areas during the period of survey (MJ);

- P (e): Output of equivalent product (electrical energy), hl;

- P (t): Output of equivalent product (thermal energy), hl;

6. Determination of E1, T1, P(e) and P(t):

a) Determination of electrical energy E1

...

...

...

Please login or register Member Pro here to see the full English Document.



b) Determination of thermal energy T1

T1 shall be calculated according to Formula 1.4 in Annex I.

c) Determination of output of equivalent product P(e), P(t)

If the facility produces either fizzy product or still product:

Output of equivalent product P(e) is calculated as follows:

P(e) = p3 + p4 + p5x0.99 + p6                [hl]                    (Formula 2.2)

Where:

- P(e): Output of equivalent product (thermal energy) during the period of survey (hl);

- p3: Output of bottled soft drinks (disposable bottles) during the period of survey (hl);

...

...

...

Please login or register Member Pro here to see the full English Document.



- p5: Output of canned beverage during the period of survey (hl);

- p6: Output of packaged soft drinks during the period of survey (hl);

- 0.99: Conversion factor (electrical energy) from canning to bottling (disposable bottles).

Output of equivalent product P(t) is calculated as follows:

P(t) = p3 + p4x3.89 + p5 + p6                 [hl]                    (Formula 2.3)

Where:

- P(t): Output of equivalent products (thermal energy) during the period of survey (hl);

- p3: Output of bottled soft drinks (disposable bottles) during the period of survey (hl);

- p4: Output of bottled soft drinks (glass bottles) during the period (hl);

...

...

...

Please login or register Member Pro here to see the full English Document.



- p6: Output of packaged beverage during the period of survey (hl);

- 3.89: Conversion factor (thermal energy) from glass bottles to disposable bottles.

If the facility produces both fizzy product and still product:

Output of equivalent products P(e) is calculated as follows:

P(e) = 0.5 x (p1 + p2x1.31 + p3 + p4 + p5x0.99 + p6)      [hl]        (Formula 2.4)

Where:

- P(e): Output of equivalent products (electrical energy) during the period of survey (hl);

- p1: Output of fizzy beverage during the period of survey;

- p2: Output of still beverage during the period of survey;

...

...

...

Please login or register Member Pro here to see the full English Document.



- p4: Output of bottled soft drinks (glass bottles) during the period (hl);

- p5: Output of canned soft drinks during the period of survey (hl);

- p6: Output of packaged soft drinks during the period of survey (hl);

- 1.31: Conversion factor (electrical energy) from still soft drinks to fizzy beverage;

- 0.99: Conversion factor from canned soft drinks to bottled soft drinks (disposable bottles).

Output of equivalent product P(t) is calculated as follows:

P(t) = 0.5x x (p1 + p2x0.96 + p3 + p4x3.89 + p5 + p6)     [hl]        (Formula 2.5)

Where:

- P(t): Output of equivalent product (thermal energy) during the period of survey (hl);

...

...

...

Please login or register Member Pro here to see the full English Document.



- p2: Output of still beverage during the period of survey;

- p3: Output of bottled soft drinks (disposable bottles) during the period of survey (hl);

- p4: Output of bottled soft drinks (glass bottles) during the period of survey (hl);

- p5: Output of canned soft drinks during the period of survey (hl);

- p6: Output of packaged soft drinks during the period of survey (hl);

- 0.96: Conversion factor (thermal energy) from still soft drinks to fizzy beverage;

- 3.89: Conversion factor (thermal energy) from bottled soft drinks (glass bottles) to bottled soft drinks (disposable bottles).

 

ANNEX III

...

...

...

Please login or register Member Pro here to see the full English Document.



1. Install insulation for steam piping and refrigeration piping.

2. Purchase steam from outside service companies.

3. Save energy with high-performance lights.

4. Use inverters and electricity-saving measures.

5. Optimize wort cooling process (from one-step process into two-step process).

6. Use stratified cooling system.

7. Use compressed natural gas (CNG), rice hulls, compressed wood blocks, compressed rice hulls as fuel for boilers in place of DO.

8. Use industrial heat pumps to provide hot water for pasteurization.

9. Recover heat from hops cooking

...

...

...

Please login or register Member Pro here to see the full English Document.



11. Install steam compressors for boilers.

12. Recover weak wort

13. Use biogas from wastewater treatment plants to operate electricity generators or stoke boilers.

14. Typical measure for facilities below 20 million liters in capacity:

a) Install pressure tanks for air compressors

b) Replace old filling systems.

 

ANNEX IV

A NUMBER OF ENERGY SAVING MEASURES IN BEVERAGE PRODUCTION INDUSTRY (Enclosed with the Ministry of Industry and Trade’s Circular No. 19/2016/TT-BCT dated September 14, 2016)

...

...

...

Please login or register Member Pro here to see the full English Document.



1. Adjust operation of syrup cooling system.

2. Install heat recovery from boilers

3. Optimize operation of air compressing system.

4. Replace old filling systems.

5. Replace boilers

6. Innovate lighting system

7. Recover condensate

8. Install insulation for steam piping.

9. Use inverters and electricity-saving measures.

...

...

...

Please login or register Member Pro here to see the full English Document.



11. Use stratified cooling system.

12. Replace reciprocating ammonia compressors with high-performance screw compressors.

II. A number of typical energy saving measures for still beverage production:

1. Recover condensate

2. Innovate lighting system

3. Repair and replace steam traps

4. Recover excess gas from boilers

5. Install insulation for steam piping.

6. Use inverters and electricity-saving measures.

...

...

...

Please login or register Member Pro here to see the full English Document.



 

ANNEX V

SPECIMEN REPORT ON IMPLEMETATION OF ENERGY CONSUMPTION NORMS IN BEER AND BEVERAGE PRODUCTION INDUSTRY (Enclosed with the Ministry of Industry and Trade’s Circular No. 19/2016/TT-BCT)

REPORT ON IMPLEMENTATION OF ENERGY CONSUMPTION NORMS IN BEER AND BEVERAGE PRODUCTION INDUSTRY IN THE YEAR 20 ...

Respectfully addressed to: General Directorate of Energy, the Ministry of Industry and Trade

In the implementation of the Ministry of Industry and Trade’s Circular No. .../.../TT-BCT dated ... stipulating implementation of energy consumption norms in beer and beverage production industry, the Service of Industry and Trade reports the implementation of energy consumption norms in beer and beverage production industry in the administrative division as follows:

I. Implementation of energy consumption norms in beer production industry:

- Number of facilities that have made reports:

- Number of facilities failing to make reports:

...

...

...

Please login or register Member Pro here to see the full English Document.



Name of facilities

1

 

2

 

3

 

 

...

...

...

Please login or register Member Pro here to see the full English Document.



No.

Name of facilities

SEC (MJ/tonne)

Measures to increase efficiency in energy use and implementation period

1

 

 

 

2

...

...

...

Please login or register Member Pro here to see the full English Document.



 

 

3

 

 

 

 

 

...

...

...

Please login or register Member Pro here to see the full English Document.



II. Implementation of energy consumption norm in beverage production industry:

- Number of facilities that have made reports:

- Number of facilities failing to make reports:

No.

Name of facilities

1

 

2

 

...

...

...

Please login or register Member Pro here to see the full English Document.



 

 

- Number of facilities failing to meet energy consumption norms:

No.

Name of facilities

SEC (MJ/tonne)

Measures to increase efficiency in energy use and implementation period

1

...

...

...

Please login or register Member Pro here to see the full English Document.



 

 

2

 

 

 

3

 

 

...

...

...

Please login or register Member Pro here to see the full English Document.



 

 

 

 

Report date ...

 

Head of agency, unit (Signature, full name and stamp)

 

...

...

...

Please login or register Member Pro here to see the full English Document.



SPECIMEN REPORT ON IMPLEMETATION OF ENERGY CONSUMPTION NORMS IN BEER AND BEVERAGE PRODUCTION INDUSTRY (Enclosed with the Ministry of Industry and Trade’s Circular No. 19/2016/TT-BCT)

REPORTS ON IMPLEMENTATION OF ENERGY CONSUMPTION NORMS IN THE YEAR 20 ...

Respectfully addressed to: The Service of Industry and Trade of province/city ...

 [Name of facility] making the report       Report date ...

Date of receipt of report

 [This space is intended for the Service of Industry and Trade's comments]

Date of settlement and confirmation

 [This space is intended for the Service of Industry and Trade's comments]

Industry classification: ...

...

...

...

Please login or register Member Pro here to see the full English Document.



Address: .............................................[Name of district ...] [Name of province ...]

Phone number: ....................Facsimile:..................................., Email: .............

Affiliated to (Name of parent company): ............

Address: .............................................[Name of district ...] [Name of province ...]

Phone number: ....................Facsimile: ..............................Email:

Owner: (State/other economic sectors)

I. Information about facility and product

Year of operation

 

...

...

...

Please login or register Member Pro here to see the full English Document.



 (Select unit of measurement as tonne/year; m/year; m2/year; m3/hour ... to suit types of products)

Production capacity

Name of product

Unit of measurement

Design output

Annually reported output

 

 

 

...

...

...

Please login or register Member Pro here to see the full English Document.



 

 

 

 

……

 

 

 

Current energy-consumption rates

...

...

...

Please login or register Member Pro here to see the full English Document.



Quantity

Unit

Purposes

Electricity

 

kWh

 

Coal

 

...

...

...

Please login or register Member Pro here to see the full English Document.



 

Fuel oil

 

Tonne

 

Diesel oil

 

Tonne

 

...

...

...

Please login or register Member Pro here to see the full English Document.



 

Tonne

 

Gas

 

M3

 

Coke

 

...

...

...

Please login or register Member Pro here to see the full English Document.



 

Coal gas

 

m3

 

Steam sought from outside service companies

 

Tonne

 

...

...

...

Please login or register Member Pro here to see the full English Document.



 

 

 

II. Implementation of energy consumption norms in the year 20 ...

a) Specific energy consumption (SEC) (Calculated according to Formula 1.1 in Annex I, or Formula 2.1 in Annex II depending on industry).

b) Ratio of improved energy consumption productivity compared with previous year: (= [(SECprevious year – SECpresent)/SECprevious year] x100%).

III. Reports on formulation of plan and measures to increase efficiency in energy use to meet energy consumption norms during present period (If any)

a) Propose measures and implementation plans to meet energy consumption norms

b) SEC expected for the next year

...

...

...

Please login or register Member Pro here to see the full English Document.



 

Report date ...

Reported by (Signature and full name)

Director of the unit (Signature, full name and stamp)

 

You Are Not Logged In Account!

Because you are not logged in, you could only view Property of Document. You couldnot view Effect of Document, Document Related, Document alternative, Original document, English documents,...

If you don't have Account yet, please register Account here
LawNet .vn
You Are Not Logged In Account!

Because you are not logged in, you could only view Property of Document. You couldnot view Effect of Document, Document Related, Document alternative, Original document, English documents,...

If you don't have Account yet, please register Account here
LawNet .vn
No content
You Are Not Logged In Account!

Because you are not logged in, you could only view Property of Document. You couldnot view Effect of Document, Document Related, Document alternative, Original document, English documents,...

If you don't have Account yet, please register Account here
LawNet .vn
No content
You Are Not Logged In Account!

Because you are not logged in, you could only view Property of Document. You couldnot view Effect of Document, Document Related, Document alternative, Original document, English documents,...

If you don't have Account yet, please register Account here
LawNet .vn
You Are Not Logged In Account!

Because you are not logged in, you could only view Property of Document. You couldnot view Effect of Document, Document Related, Document alternative, Original document, English documents,...

If you don't have Account yet, please register Account here
Quick search
Key word
posts Related Document
Other documents