Vietnam: Guidance on determination and calculation of unit labor costs of construction consultants

The Ministry of Construction of Vietnam has issued Circular No. 15/2019/TT-BXD as a manual for calculation and determination of building-sector unit labor cost, which replaces Circular No. 05/2016/TT-BXD.

In comparison with Circular No. 05/2016/TT-BXD, Circular No. 15/2019/TT-BXD of the Ministry of Construction of Vietnam has supplemented method of determination and calculation of unit labor costs of construction consultants, specifically, unit labor cost of a consultant belonging in the group of construction consultants shall be calculated by the arithmetic mean of unit labor costs of construction consultants in a group according to the following formula:

In which:

- : Unit labor cost of a consultant in the group k of consultants specified in the classification list of groups of consultants holding construction qualifications shown in Appendix No. 3 hereto (dong/working day).

- : Unit labor cost of a construction consultant performing the construction activity i in the group k of construction activities shown in Appendix No. 3 hereto, which is determined through surveys or investigations conducted according to instructions given in Appendix No. 1 hereto (dong/working day);

- n: quantity of unit labor costs of construction consultants in the group.

View details at Circular No. 15/2019/TT-BXD of the Ministry of Construction of Vietnam, effective from February 15, 2020.

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

89 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;