What are the regulations on economic-technical norms for forest investigation in Vietnam from June 22, 2024? - Thuy Chau (Ha Giang)
Regulations on economic-technical norms for forest investigation in Vietnam from June 22, 2024 (Image from the internet)
Regarding this matter, LawNet would like to answer as follows:
On April 19, 2024, the Minister of Agriculture and Rural Development (Hanoi, Vietnam) issued Circular 05/2024/TT-BNNPTNT stipulating economic-technical norms for forest investigation.
Pursuant to Clause 1, Article 3 of Circular 05/2024/TT-BNNPTNT, the economic-technical norms for forest investigation are the consumption levels of labor, materials, machinery, and equipment for the tasks in forest investigation.
General regulations on economic-technical norms for forest investigation in Vietnam are stipulated in Article 4 of Circular 05/2024/TT-BNNPTNT as follows:
- Depending on the specific conditions of each place and technical measures, apply the adjustment coefficient (K) to calculate the necessary labor consumption for each work item when preparing the outline and the estimate.
- The application of economic-technical norms must comply with the requirements stipulated in criteria, standards, norms, and technical guidelines issued by competent state authorities.
- Costs and coefficients applied in forest investigation:
+ Class wage coefficient according to regulations; mobile allowance; hazardous and dangerous occupation allowance; social insurance; health insurance; unemployment insurance; union fees;
+ Difficulty coefficient is used to adjust the labor level in the field when workers perform work with different levels of difficulty;
+ Technical labor downtime due to weather of field technical labor.
- The cost of machinery and equipment for forest investigation shall not exceed 5% of the labor cost.
- The cost of materials, tools, electricity, water, and communication shall not exceed 5% of the labor cost.
- The economic-technical norms for various types of forest investigations are attached in the appendix issued with Circular 05/2024/TT-BNNPTNT.
The economic-technical norms for forest investigation from June 22, 2024, are stipulated in Table 01, Section B, Part 2 of the appendix issued with Circular 05/2024/TT-BNNPTNT as follows:
No. | Task Name | Unit of Measure | Norm (work day) | Wage Coefficient[3] |
---|---|---|---|---|
I | PREPARATION WORK | |||
1 | Collect relevant information and materials for the task | Task | ||
1.1 | Under 500 ha | Task | 5.0 | 2.67-3.66 |
1.2 | From 500 ha to under 1,000 ha | Task | 6.0 | 2.67-3.66 |
1.3 | From 1,000 ha to under 3,000 ha | Task | 7.0 | 2.67-3.66 |
1.4 | From 3,000 ha to under 5,000 ha | Task | 8.0 | 2.67-3.66 |
1.5 | From 5,000 ha to under 10,000 ha | Task | 9.0 | 2.67-3.66 |
1.6 | From 10,000 ha to under 30,000 ha | Task | 11.0 | 2.67-3.66 |
1.7 | From 30,000 ha to under 50,000 ha | Task | 13.0 | 2.67-3.66 |
1.8 | From 50,000 ha to under 100,000 ha | Task | 15.0 | 2.67-3.66 |
1.9 | From 100,000 ha to under 200,000 ha | Task | 17.0 | 2.67-3.66 |
1.10 | From 200,000 ha to under 400,000 ha | Task | 19.0 | 2.67-3.66 |
1.11 | From 400,000 ha to under 600,000 ha | Task | 21.0 | 2.67-3.66 |
1.12 | From 600,000 ha and above | Task | 23.0 | 2.67-3.66 |
2 | Develop execution outline and cost estimate for the task | Task | 20.0 | 4.65-5.76 |
3 | Technical outline and cost estimate approval meeting | Meeting | 20.0 | 4.65-5.76 |
4 | Amend the technical outline and cost estimate for the task | Task | 3.5 | 4.65-5.76 |
5 | Design technical implementation of the task | Task | 10.0 | 4.65-5.76 |
6 | Agree on technical measures | Task | 5.0 | 2.67-3.66 |
7 | Develop execution plan for the task | Task | ||
7.1 | Under 500 ha | Task | 2.0 | 3.00-3.99 |
7.2 | From 500 ha to under 1,000 ha | Task | 3.0 | 3.00-3.99 |
7.3 | From 1,000 ha to under 3,000 ha | Task | 4.0 | 3.00-3.99 |
7.4 | From 3,000 ha to under 5,000 ha | Task | 5.0 | 3.00-3.99 |
7.5 | From 5,000 ha to under 10,000 ha | Task | 6.0 | 3.00-3.99 |
7.6 | From 10,000 ha to under 30,000 ha | Task | 7.0 | 3.00-3.99 |
7.7 | From 30,000 ha to under 50,000 ha | Task | 8.0 | 3.00-3.99 |
7.8 | From 50,000 ha to under 100,000 ha | Task | 9.0 | 3.00-3.99 |
7.9 | From 100,000 ha to under 200,000 ha | Task | 10.0 | 3.00-3.99 |
7.10 | From 200,000 ha to under 400,000 ha | Task | 11.0 | 3.00-3.99 |
7.11 | From 400,000 ha to under 600,000 ha | Task | 12.0 | 3.00-3.99 |
7.12 | From 600,000 ha and above | Task | 13.0 | 3.00-3.99 |
8 | Receive various maps for task execution | Commune | 2.0 | 2.06-3.33 |
9 | Establish remote sensing image map | |||
9.1 | Scale 1/5,000 | Sheet | 15.6 | 3.33-4.32 |
9.2 | Scale 1/10,000 | Sheet | 18.7 | 3.33-4.32 |
9.3 | Scale 1/25,000 | Sheet | 22.4 | 3.33-4.32 |
9.4 | Scale 1/50,000 | Sheet | 26.9 | 3.33-4.32 |
9.5 | Scale 1/100,000 | Sheet | 32.3 | 3.33-4.32 |
9.6 | Scale 1/250,000 | Sheet | 38.7 | 3.33-4.32 |
9.7 | Scale 1/500,000 | Sheet | 46.4 | 3.33-4.32 |
9.8 | Purchase existing image maps (implement according to current regulations) | |||
10 | Inherit and establish necessary forestry background map layers for the final map | |||
10.1 | Scale 1/1,000 | Sheet | 4.0 | 3.99-4.98 |
10.2 | Scale 1/2,000 | Sheet | 5.0 | 3.99-4.98 |
10.3 | Scale 1/5,000 | Sheet | 6.0 | 3.99-4.98 |
10.4 | Scale 1/10,000 | Sheet | 7.0 | 3.99-4.98 |
10.5 | Scale 1/25,000 | Sheet | 8.0 | 3.99-4.98 |
10.6 | Scale 1/50,000 | Sheet | 9.0 | 3.99-4.98 |
10.7 | Scale 1/100,000 | Sheet | 10.0 | 3.99-4.98 |
11 | Design and establish the system of keys for image sample points on the map using specialized software | |||
11.1 | Under 50,000 ha | Task | 6.0 | 3.66-4.65 |
11.2 | From 50,000 ha to under 200,000 ha | Task | 7.0 | 3.66-4.65 |
11.3 | From 200,000 ha to under 400,000 ha | Task | 8.0 | 3.66-4.65 |
11.4 | From 400,000 ha to under 600,000 ha | Task | 9.0 | 3.66-4.65 |
11.5 | From 600,000 ha and above | Task | 10.0 | 3.66-4.65 |
12 | Receive image key sample data collected from the field and check | |||
12.1 | Under 50,000 ha | Task | 10.0 | 3.66-4.65 |
12.2 | From 50,000 ha to under 200,000 ha | Task | 15.0 | 3.66-4.65 |
12.3 | From 200,000 ha to under 400,000 ha | Task | 20.0 | 3.66-4.65 |
12.4 | From 400,000 ha to under 600,000 ha | Task | 25.0 | 3.66-4.65 |
12.5 | From 600,000 ha and above | Task | 30.0 | 3.66-4.65 |
13 | Analyze and compare the field-collected image key set with the indoor image key set | Sample | 0.2 | 3.66-4.65 |
14 | Interpret remote sensing images and construct forest status map | |||
14.1 | Scale 1/1,000 | Sheet | 5.0 | 3.99-4.98 |
14.2 | Scale 1/2,000 | Sheet | 7.0 | 3.99-4.98 |
14.3 | Scale 1/5,000 | Sheet | 9.0 | 3.99-4.98 |
14.4 | Scale 1/10,000 | Sheet | 10.8 | 3.99-4.98 |
14.5 | Scale 1/25,000 | Sheet | 13.0 | 3.99-4.98 |
14.6 | Scale 1/50,000 | Sheet | 15.6 | 3.99-4.98 |
14.7 | Scale 1/100,000 | Sheet | 18.7 | 3.99-4.98 |
15 | Overlay map, identify the area to be field-checked during forest investigation | Commune, forest owner | 5.0 | 3.99-4.98 |
16 | Draw a 2nd level map in the office | Ha | 0.005 | 4.65-5.76 |
17 | Analyze and design the inventory sample system | |||
17.1 | Under 50,000 ha | Task | 18.0 | 4.65-5.76 |
17.2 | From 50,000 ha to under 200,000 ha | Task | 19.0 | 4.65-5.76 |
17.3 | From 200,000 ha to under 400,000 ha | Task | 20.0 | 4.65-5.76 |
17.4 | From 400,000 ha to under 600,000 ha | Task | 21.0 | 4.65-5.76 |
17.5 | From 600,000 ha and above | Task | 22.0 | 4.65-5.76 |
18 | Investigate sample fluctuation | |||
18.1 | Under 50,000 ha | Task | 50.0 | 3.33-4.32 |
18.2 | From 50,000 ha to under 200,000 ha | Task | 55.0 | 3.33-4.32 |
18.3 | From 200,000 ha to under 400,000 ha | Task | 60.0 | 3.33-4.32 |
18.4 | From 400,000 ha to under 600,000 ha | Task | 65.0 | 3.33-4.32 |
18.5 | From 600,000 ha and above | Task | 70.0 | 3.33-4.32 |
19 | Prepare materials, techniques | Task | 10.0 | 2.06-3.33 |
More details can be found in Circular 05/2024/TT-BNNPTNT which is effective in Vietnam from June 22, 2024.