Improving the On-field Irrigation Systems under the National Target Program

Circular 05/2017/TT-BNNPTNT was promulgated by the Ministry of Agriculture and Rural Development on March 1, 2017, specifically regulating the completion of intra-field irrigation systems under the national target program.

Accordingly, the completion of the internal irrigation system shall be implemented as follows:

- Investment in the construction of internal irrigation must ensure conformity with the approved irrigation planning and related plans; comply with current technical standards and regulations on construction investment;- Determining irrigation works that need priority investment through the majority consensus of the community, applying a participatory design process, and community monitoring of construction investment to improve the quality and effectiveness of the works;- Investment in the construction of internal irrigation linked with the construction of internal roads, farms, land consolidation, and field design suitable for regions to enable the application of advanced farming methods, meeting the requirements of agricultural production restructuring;- Application of advanced technologies and water-saving methods in the investment and construction of internal irrigation systems.

See details Circular 05/2017/TT-BNNPTNT effective from April 15, 2017.

-Thao Uyen-

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

0 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;