How Much Is the Fee for Appraising the Construction of Radiation Facilities in Vietnam?

Circular 287/2016/TT-BTC has been signed and promulgated by the Ministry of Finance of Vietnam to regulate the rates, collection policies, payment, management, and use of fees and charges in the field of nuclear energy.

The appraisal fee for issuing a construction permit for a radiation facility in Vietnam is specified in Circular 287/2016/TT-BTC as follows:

No. Description of Fee Collection Unit Fee Rate (VND)
5.1 Radioactive material production and processing facility 1 facility 25,000,000
5.2 Radioactive waste treatment facility with activity greater than 10,000 times the exemption level 1 facility 25,000,000
5.3 National radioactive waste storage facility 1 facility 40,000,000
5.4 Other radiation facilities 1 facility 15,000,000

Additionally, if there is a change in the scale or scope of operation of the radiation facility; termination of the operation permit of the radiation facility, the appraisal fee will be:

No. Description of Fee Collection Unit Fee Rate (VND)
6.1 Appraisal for issuing permit to change the scale or scope of operation of the radiation facility:
6.1.1 Radioactive material production and processing facility 1 facility 25,000,000
6.1.2 Radioactive waste treatment facility with activity greater than 10,000 times the exemption level 1 facility 25,000,000
6.1.3 National radioactive waste storage facility 1 facility 40,000,000
6.1.4 Other radiation facilities 1 facility 15,000,000
6.2 Appraisal for issuing permit to terminate the operation of the radiation facility:
6.2.1 Accelerator operation facility 1 facility 7,000,000
6.2.2 Radiotherapy facility using high-dose-rate brachytherapy equipment and teletherapy equipment using radioactive sources 1 facility 25,000,000
6.2.3 Sterilization irradiation facility, irradiation treatment facility using radioactive sources 1 facility 25,000,000
6.2.4 Radioactive waste treatment facility with activity greater than 10,000 times the exemption level 1 facility 25,000,000
6.2.5 Radioactive material production and processing facility 1 facility 40,000,000
6.2.6 National radioactive waste storage facility 1 facility 65,000,000

More details can be found in Circular 287/2016/TT-BTC effective from January 1, 2017.

- Thanh Lam -

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

0 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;