Hanoi-Vietnam: Technological labor norm in the preparation of road plans of remote sensing images

On July 05, 2019, the Vietnam Ministry of Natural Resources and Environment issued Circular No. 08/2019/TT-BTNM regarding the Economic-technical norms for the design of thematic maps by using remote sensing images in Vietnam at scales of 1:5,000, 1:10,000, 1:500,000, 1:1,000,000.

Regulation  on  labor  norms  for  establishing  remote  sensing  image  maps,  Circular  08/2019/TT-BTNMT

Technological labor norm in the preparation of road plans of remote sensing images in Vietnam (Illustrative photo)

The economic-technical norms issued together with Circular 08/2019/TT-BTNMT define the technological labor norm in the preparation of road plans of remote sensing images at scales of 1:5,000, 1:10,000, 1:500,000, and 1:1,000,000 in Vietnam. To be specific:

1. Task Content:

- Collect and take remote sensing images

- Measure photo control (applied only for thematic maps at scales of 1:5,000 and 1:10,000), as per the Circular promulgating the economic-technical norms for remote sensing photo control.

- Establish a digital elevation model (applied only for thematic maps at a scale of 1:5,000).

- Input initial data.

- Densify remote sensing image blocks.

- Geometrically correct remote sensing images.

- Enhance image quality.- Align, merge, and cut remote sensing image tiles.- Frame setup, coordinate grid, annotation, and outside frame elements of road plan of remote sensing images.

2. Difficulty classification:

- Type 1: Plains region, sparsely populated, simple structures; Low mountain regions, sparse vegetation and population, non-disrupted terrain; Easy judgment and point determination.

- Type 2: Plains region with relatively dense population, small commune-level towns, and industrial zones; Intermixed hill and mountain regions, relatively dense vegetation; Difficult judgment and point determination.

- Type 3: Densely populated plains region; Cities, district-level towns, large industrial zones, complex structures; Mountainous, high mountains, dense vegetation; very difficult judgment and point determination.

3. Staffing: 01 measuring cartographer III.4

4. Norms: Work/fragment

Task Difficulty Type Scale 1:5,000 Scale 1:10,000 Scale 1:500,000 Scale 1:1,000,000
Preparation of road plan of remote sensing images 1 13.76 16.51 67.92 81.50
  2 15.54 18.65 77.42 92.91
  3 17.46 20.95 88.74 106.48

Details can be found in Circular 08/2019/TT-BTNMT effective from August 20, 2019.

Ty Na

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

0 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;