Hanoi-Vietnam: Minimum area of the underground roadway system used for practical test

On August 1, 2018, the Vietnam Ministry of Labor, Invalids and Social Affairs issued Circular 06/2018/TT-BLDTBXH regulating the list of facilities and equipment for the assessment of national vocational skills for the professions of Underground Mining Engineering, Underground Mine Construction Engineering, and Underground Mine Electromechanical Engineering at vocational skill levels 1, 2, and 3.

Circular 06 sets forth the standards for the minimum area of the underground roadway system used for practical tests in Vietnam as follows:

No. Name Unit Quantity Basic Technical Requirements Notes
1 The floor area of the practical assessment area m^2^ 8,000 Includes all constructions used during the assessment period and auxiliary services.  
2 Roadway system m 508

- Designed and approved by a legally authenticated agency (unit authorized to design the mine) solely for skill assessment and vocational training;

- Underground mining sites that are currently in production, temporarily halted, or have ceased production cannot be used for practical examination.

Continuous connection
  Including the following roadways        
2.1 Main transport roadway m 50

- Constructed with reinforced concrete, thickness of 0.3 m.

- Supported by arch-shaped frames:

+ Ssd ≥ 9.5 m^2^;

+ B ≥ 3,800 mm

+ H ≥ 2,900 mm

Figure 1
2.2 Main ventilation roadway m 50

- Constructed with reinforced concrete, thickness of 0.3 m.

- Supported by arch-shaped frames:

+ Ssd ≥ 9.5 m^2^;

+ B ≥ 3,800 mm

+ H ≥ 2,900 mm

 
2.3 Inclined roadway m 40

- Constructed with reinforced concrete, thickness of 0.3 m.

- Supported by arch-shaped frames:

+ Ssd ≥ 6.8 m^2^;

+ B ≥ 2,600 mm

+ H ≥ 2,000 mm

+ Slope 10° ≤ α ≤ 35°

Figure 2
2.4 Three-way branching roadway m 40

- Constructed with reinforced concrete, thickness of 0.3 m.

- Supported by arch-shaped frames:

+ Ssd ≥ 9.5 m^2^;

+ B ≥ 3,800 mm

+ H ≥ 2,900 mm

 
2.5 Station chamber m 50 - Constructed with reinforced concrete, thickness of 0.3 m.

+ Ssd ≥ 4.5 m^2^;

+ B ≥ 2,200 mm

+ H ≥ 2,300 mm

Figure 3
2.6 Straight roadway section supported by frames m 50

- Constructed with reinforced concrete, thickness of 0.3 m.

- Supported by arch-shaped frames: + Ssd ≥ 6.8 m^2^;

+ B ≥ 2,600 mm

+ H ≥ 2,000 mm

 
2.7 Inclined roadway section supported by frames m 50

- Constructed with reinforced concrete, thickness of 0.3 m.

- Supported by arch-shaped frames:

+ Ssd ≥ 6.8 m^2^;

+ B ≥ 2,600 mm

+ H ≥ 2,000 mm

+ Slope 10° ≤ α ≤ 35°

 
2.8 Vertical shaft roadway section m 10

- Shaft diameter ≥ 4 m

- Constructed with reinforced concrete, thickness of 0.3 m:

+ Base height 0.5 m

+ Shaft body height 8.2 m

+ Shaft collar height 0.8 m

- Equipped with full machinery for lifting, ventilation, drainage, and signal systems

Figure 4
2.9 Roadway section supported by anchors m 30

- Constructed with double-layer reinforced concrete, thickness between layers ≥ 1.6m.

- Supported by arch-shaped frames:

+ Ssd ≥ 9.0 m^2^;

+ B ≥ 3,500 mm

+ H ≥ 2,950 mm

Figure 5
2.10 Reinforced and restored supported section m 30

- Constructed with reinforced concrete, thickness of 0.3 m.

- Supported by arch-shaped frames:

+ Ssd ≥ 9.5 m^2^;

+ B ≥ 3,800 mm

+ H ≥ 2,900 mm

- Roof hollow length ≥ 3m

 
2.11 Gas explosion incident handling section m 30 - Constructed with reinforced concrete, thickness of 0.3 m.

- Supported by arch-shaped frames:

+ Ssd ≥ 9.5 m^2^;

+ B ≥ 3,800 mm

+ H ≥ 2,900 mm

 
2.12 Roadway section excavated by Combain machine m 30

- Constructed with reinforced concrete, thickness of 0.3 m.

- Supported by arch-shaped frames:

+ Ssd ≥ 9.5 m^2^;

+ B ≥ 3,800 mm

+ H ≥ 2,900 mm

 
2.13 Mining roadway supported by single columns and articulated beams m 15

- Dimensions (length x width x height) ≥ (15.5 x 5.8 x 2.58)m; reinforced concrete construction.

- Slope 7° ≤ α ≤ 18°

Figure 6
2.14 Mining roadway supported by the hydraulic movable prop (XDY) m 15

- Dimensions (length x width x height) ≥ (15.5 x 5.8 x 2.58)m; reinforced concrete construction.

- Slope 7° ≤ α ≤ 18°

 
2.15 Mining roadway supported by the hydraulic movable frame (ZH, chain frame) m 15

- Dimensions (length x width x height) ≥ (15.5 x 5.8 x 2.58)m; reinforced concrete construction.

- Slope 7° ≤ α ≤ 18°

 
2.16 Drilling face m 3

- Constructed with reinforced concrete, thickness of 0.3 m.

+ Ssd ≥ 4.5 m^2^;

+ B ≥ 2,200 mm

+ H ≥ 2,300 mm

Figure 7
3 Electrical system HT 1    
3.1 Transformer station Station 1

- Capacity ≥ 200 KV

- Primary/secondary voltage 22/0.4 KV

 
3.2 Diesel generator station Station 2

- Capacity ≥ 200 KVA

- Voltage 380/220

 
3.3 Electricity supply system for underground equipment HT 2

- Three-phase isolated neutral, non-grounded.

- Explosion-proof rubber cables.

 
3.4 Cutting device for each load Unit/load 02

- Explosion-proof automatic circuit breaker or explosion-proof starter with capacity suited to the load's power and voltage.

- ExdI explosion-proof rating

 
3.5 Personal lighting lamps Unit 100

- Voltage: 3.7 v

- Operation time > 11 hours

 
4 Ventilation system HT 1    
4.1 Main ventilation fan Unit 2

- N ≥ 11 KW

- Voltage 380/660 V

- Q ≥ 130 m^3^/s

- dB (A) ≤ 91

- Efficiency (%) ≥ 80

- ExdI explosion-proof rating

 
4.2 Local ventilation fan Unit 2

- N ≥ 2.2 KW

- Voltage 380/660 V

- Q ≥ 5.2 m^3^/s

- ExdI explosion-proof rating

- Overall useful efficiency coefficient KDP (%) ≥ 64.

64.
 
4.3 Main ventilation station Station 1

- Dimensions (length x width x height) ≥ (5 x 3 x 2.2) m; reinforced concrete construction.

- Slope ≤ 7°

 
5 Water pumps Unit 2

- N ≥ 4.5 KW

- Voltage 380/660 V

- Q ≥ 30 m^3^/h

- ExdI explosion-proof rating

 
6 Underground transport system HT 1    
6.1 Mine car track m 60

- B ≥ 600 mm

- P 18 rail, wooden or concrete sleepers

- NO618 - 1/2-4 switching track

 
6.2 Mine car Unit 2 - Capacity ≥ 1000 cm^3^  
6.3 Material transport car Unit 2 - Dimensions (2500 x 1,200 x 1,000)m  
6.3 Transport winch HT 1

- Capacity > 10 tons/hour

- Pulling force: ≥ 150 kN

- Transport distance > 10 m

- ExdI explosion-proof rating

 
6.4 Mano winch Unit 2 - Pulling force: ≥ 10 kN

- Transport distance > 30 m

- ExdI explosion-proof rating
 
6.5 Battery electric locomotive Unit 4

- Weight 2500kg

- Voltage 48V

- Dimensions 2150x920x1460

- ExdI explosion-proof rating

 
6.6 Battery pack Unit 8

- Voltage 48V

- Capacity 330 amps/hour

- ExdI explosion-proof rating

 
6.7 Battery charger cabinet Unit 4

- Input voltage AC - 660/380V

- Output voltage DC71V

- Electric current 90A

- ExdI explosion-proof rating

 
7 Compressed air supply system HT 1    
7.1 Air compressor station Station 1

- Length x Width x Height: (2.5 x 4.5)

- Solid reinforced concrete base

 
7.2 Air compressor Unit 2

- N ≥ 11 KW

- Q = 5m^3^/min

- P = 7 atm

- Ex explosion-proof rating

 
8 Fire prevention equipment        
8.1 Sand container Container 02 Standard type  
8.2 Powder fire extinguisher Unit 10 According to Vietnamese standards (TCVN) on fire prevention  
8.3 Foam fire extinguisher Unit 10 According to Vietnamese standards (TCVN) on fire prevention  
9 Underground lighting system HT 1    
9.1 Lighting transformer Unit 4 - Capacity ≤ 4KVA

- Voltage 380,660/133V

- ExdI explosion-proof rating
 
9.2 Explosion-proof lighting lamp Unit 50 - KBB explosion-proof type

- Voltage 127V; capacity 60W

- ExdI explosion-proof rating
 
10 Automatic gas monitoring system HT 1    
10.1 Central cabinet Unit 2

- Voltage 220-280VAC

- Measurement channels: max 40

- Connects to CPC-2 & TC-100/P sensors

 
10.2 Gas sensors Unit 10
 
- Voltage 12 VDC
 
- Imax 40mA
 
- Measurement range: 5% and 100%
 
- Resolution 0.01% for 5% range and 1% for 100% range
 
- Explosion protection type: ExiaI.
 
10.3 Wind sensors Unit 10

- Voltage 18 VDC

- Electric current 1 ÷ 5mA

- Wind speed measurement range 0.3 ÷ 5m/s

 
           

Circular 06/2018/TT-BLDTBXH takes effect from September 15, 2018.

- Thanh Lam -

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

0 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;