This is the content stipulated in Circular 09/2018/TT-BXD issued by the Ministry of Construction on November 15, 2018, concerning the technical safety inspection procedures for drilling machines, pile-driving machines, and pile-pressing machines used in construction execution.
According to Circular 09, the technical inspection of the exterior involves evaluating the actual condition of the machine and its components by visual observation. The actual condition of the machine is compared with its condition under normal circumstances, based on the experience and knowledge of the inspector, to detect any abnormal signs and provide conclusions or designate other inspection methods. The content of the exterior technical inspection of the machine includes:
- The synchrony of the machine according to the design;- The machine is assembled according to the design;- Deformations (cracks, warping), paint condition, corrosion of the machine's metal structures;- Leakage of hydraulic oil, the condition of the insulation and clamps of the electrical cables, and the general condition of the hydraulic and electrical systems;- The adequacy of hydraulic oil and lubricating oil capacity;- The synchrony of safety control devices, limit control devices, covers, and protective nets for moving parts;- The usage and maintenance log of the machine.
See details in Circular 09/2018/TT-BXD effective from January 1, 2019.
-Thao Uyen-
Address: | 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City |
Phone: | (028) 7302 2286 |
E-mail: | [email protected] |