Content of Direct Monitoring of Mineral Exploration Project

On December 26, 2016, the Ministry of Natural Resources and Environment issued Circular 44/2016/TT-BTNMT stipulating the content of the supervision of construction work for the Mineral Exploration Scheme.

According to Circular 44/2016/TT-BTNMT, depending on different projects, there will be corresponding monitoring contents, specifically:

- Excavation works (pits, trenches, wells, tunnels): brief description of the progress of project execution on site; accurate confirmation of: equipment, construction personnel, project location, project size, mineral body thickness, executed volume.- Drilling: brief description of the drilling process on site; accurate confirmation of: equipment, construction personnel, location, core sample ratio, executed volume, mineral body wall and pillar.- Borehole logging: brief description of the measurement process on site; accurate confirmation of: equipment, personnel, method, executed volume.- Pumping and experimental water extraction: brief description of the execution process on site; accurate confirmation of: equipment, personnel, time, executed volume.- …

Circular 44/2016/TT-BTNMT has been effective since February 10, 2017.

- Thanh Lam -

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

0 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;