Decree No. 08/2018/NĐ-CP of Vietnam’s Government was issued on January 15, 2018, which provides amendments to certain conditions for grant of licenses for advisory of investment in construction of Hydro-power plans previously specified in Decree No. 137/2013/NĐ-CP.

Specifically, according to Clause 8 Article 6 of Decree No. 08/2018/NĐ-CP of Vietnam’s Government amending Article 39 of Decree No. 137/2013/NĐ-CP, the organization established under regulations of law and registering for providing consulting services for construction of hydroelectric power stations shall satisfy the following conditions:

- The organization has the staff of consulting experts with primary consulting experts having at least bachelor's degrees in electrical engineering, hydroelectric engineering, irrigation engineering, geological engineering, environmental engineering or equivalent majors, at least 5-year experience of working in the field of consulting and designing at least one project on hydroelectric power station with equivalent capacity and having suitable construction certificates.

- The organization has necessary equipment, technical means, and application software for advisory of investment in construction of Hydro-power plant works.

- The organization has the number of primary consulting experts under the following ranking of hydroelectric works

+ 1st rank: at least 25 experts;

+ 2nd rank: at least 20 experts;

+ 3rd rank: at least 15 experts;

+ 4th rank: at least 10 experts.

Decree No. 08/2018/NĐ-CP of Vietnam’s Government has annulled certain conditions for grant of licenses for advisory of investment in construction of Hydro-power plans of Decree No. 137/2013/NĐ-CP, specifically as follows:

- Annulling Clause 1 Article 39: “Being an advisory organization in specialized branch, having professional capacity of technology and hydro-power plant works, analysis of technique, economy and finance of projects, environmental impact assessments”.

- Annulling Clause 2 Article 39: “Having a contingent of advisory experts including major advisory experts and other advisory experts having experiences in equipment of hydraulic works, electric equipment, water treatment, automatic control, hydraulic works, and hydrology, hydraulic energy, Hydrometeorological, geologist of works, geological technique, structure and organization of construction of hydro-power plants and fields related to types of hydro-power plants”.

- Annulling Clause 4 Article 39: “Major advisory expert, who does task of the main responsible advisory expert, apart from conditions specified at Clause 3 of this Article, must have been head of a scheme, or main responsible for designing project on Hydro-power plant with equivalent capacity or participated in designing at least three projects on Hydro-power plants with equivalent capacity”.

View relevant contents at Decree No. 08/2018/NĐ-CP of Vietnam’s Government, effective from January 15, 2018.

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

35 lượt xem



Related Document
  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: info@lawnet.vn
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;