Vietnam: Regulations on the level of study and zoning of iron resource level 222 and level 332

This is the content stipulated in Circular 33/2010/TT-BTNMT on exploration, classification of reserves, and resources of iron ore mines, issued by the Minister of Natural Resources and Environment of Vietnam.

resource        zoning,        Circular        33/2010/TT-BTNMT

Vietnam: Regulations on the level of study and zoning of iron resource level 222 and level 332 (Illustrative photo)

Article 9 Circular 33/2010/TT-BTNMT stipulates the requirements for the level of study and zoning of iron resource level 222 and level 332 in Vietnam as follows:

1. Level of geological study and zoning of resource level

- The level of geological study and zoning of resource level 222 and level 332 shall follow Clauses 1 and 2 of Article 7 of this Circular.

2. Level of study of investment in mine construction and degree of economic efficiency

- Resource level 222

- The level of study of investment in mine construction and degree of economic efficiency shall follow Point b, Clause 2 of Article 8 of this Circular.

- Resource level 332

An investment study in mine construction has not yet been conducted, and it has not been determined whether the mining and processing of ore with the comprehensive recovery of valuable industrial component contents in the ore from this resource has economic efficiency or potential economic efficiency at the assessment time. However, the results of the geological study have affirmed the reliability of this resource.

More details can be found in Circular 33/2010/TT-BTNMT effective from January 28, 2011.

Nguyen Phu

>> CLICK HERE TO READ THIS ARTICLE IN VIETNAMESE

0 lượt xem



  • Address: 19 Nguyen Gia Thieu, Vo Thi Sau Ward, District 3, Ho Chi Minh City
    Phone: (028) 7302 2286
    E-mail: [email protected]
Parent company: THU VIEN PHAP LUAT Ltd.
Editorial Director: Mr. Bui Tuong Vu - Tel. 028 3935 2079
P.702A , Centre Point, 106 Nguyen Van Troi, Ward 8, Phu Nhuan District, HCM City;